EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 26, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a residential development in Minneapolis, Minnesota. Completed plans call for the renovation of a residential development.

Q/A Cutoff Date: 06/14/2022, Q/A Cutoff Time: 04:00 PM EDT Required bonds include a bid guarantee from each bidder, equivalent to 5% of the bid price, and the following from the Contractor A performance bond for 100% of the contract price; and A payment bond for 100% of the contract price. The MPHA reserves the right to Reject any or all bids, to waive any informality in the IFB process, or to terminate the IFB process at any time, if deemed by the MPHA to be in its best interests. The Project consists of the replacement of apartment windows, corridor windows and installation of metal panels at a high rise apartment building CONTRACT DESCRIPTION A. Contract Type: A single prime contract based on a Stipulated Price B. Summary of the Work: Scope of alterations work is indicated on drawings and as summarized below. 1. All bid quantities are estimated and actual quantities completed may be higher or lower than bid quantities based on conditions discovered during construction. Payment to contractor is based on the actual quantities of work completed, calculated using the unit prices for each work item provided in the bid form. Addendum #1 & #2 have been issued as of 6-20-2022.

Bid Results

Residential Subdivision

$4,500.00

Public - City

Renovation

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
66
Bidding Soon
859
All Active Projects
449
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2022

January 2, 2023

img_map_placeholder

1707 3rd Ave S, Minneapolis, MN


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.