BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Sherman, Texas. Completed plans call for site work for a sidewalk / parking lot; water / sewer project; for the renovation of a water / sewer project; and for paving for a sidewalk / parking lot.

This project includes equalization basin improvements at the City of Sherman Post Oak Wastewater Treatment Plant. The project consists of replacing three (3) sluice gates with electrically actuated slide gates at the fine screens unit, replace joint material and concrete paving at equalization basin, electrically actuate one (1) existing slide gate at aeration basin and electrically actuate three (3) existing telescoping valves and three (3) existing slide gates at the clarifier control station. Direct questions regarding distribution of Contract Documents to Cynthia Boyd at Perkins Engineering Consultants, Inc. Direct questions regarding the design of the project to Justin Angel, Perkins Engineering Consultants, Inc. through the CivCast website listed above. Mr. Angel may also be reached via email at jangel@perkinsconsultants.com or by phone at 817-719-0372. All questions must be submitted in writing through the CivCast website prior to seventy two (72) hours before the bid opening. Bidders must submit a cashier's check, certified check, or acceptable bidder's bond with their proposal as a guarantee that the Bidder will enter into a contract for the project with the Owner within fifteen (15) days of Notice of Award of the contract. The security must be payable to the Greater Texoma Utility Authority on behalf of the City of Sherman in the amount of five (5%) percent of the bid submitted. Contractor must execute the contract, bonds and certificates of insurance on the forms provided in the Contract Documents.Performance and Payment Bonds are required, each in an amount of not less than one-hundred percent (100%) of the contract price, conditioned upon the faithful performance of the contract and upon payment of all persons supplying labor or furnishing materials. Greater Texoma Utility Authority on behalf of the City of Sherman reserves the right to adopt the most advantageous interpretation of the bids submitted in the case of ambiguity or lack of clearness in stating proposal prices, to reject any or all bids, and/or waive formalities. Bids may not be withdrawn within sixty (60) days from date on which bids are opened.

Post-Bid

Water / Sewer

$650,000.00

Public - City

Paving, Renovation, Site Work

25

17

2

6

Subscribe For Documents

77 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
61
Bidding Soon
3,364
All Active Projects
1,330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.