BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Claremore, Oklahoma. Completed plans call for the construction of a 17,600-square-foot, one-story above grade educational facility; and for site work for a educational facility.

Project consists of a fully-sprinkled, conventional steel structure building with masonry and glass exterior with associated site work. Bid Package 3A: Concrete Bid Package 4A: Masonry Bid Package 5A: Metals Bid Package 6A: Cabinets and Countertops Bid Package 7A: Roofing, Metal Panels, Metal Soffits Bid Package 7B: Water Proofing and Sealants Bid Package 7D: Exterior Insulation and Finishing Systems Bid Package 8A: Doors, Frames, Hardware Bid Package 8B: Overhead Sectional and Coiling Doors Bid Package 8C: Aluminum Storefronts and Glazing Bid Package 9A: Ceilings, Drywall, Light Gauge Framing Bid Package 9B: Paint Bid Package 9C: Flooring Bid Package 10A: Toilet Accessories, Fire Protection Specialties, and Visual Displays Bid Package 21A: Fire Suppression Bid Package 22A: Plumbing Bid Package 23A: HVAC Bid Package 26A: Electrical Bid Package 28A: Fire Alarm Bid Package 31A: Site Work PLEASE NOTE: The overall duration of construction for this project will be from July 2022 thru May 2023. The current overall construction schedule does not allow for additional days of construction to be awarded for weather or material delays. The Construction Manager reserves the right to require subcontractors to work in multiple shifts per day, weekends, and/or Holidays to make up for lost time, late starts, and other schedule delays. Costs for overtime, premium time or shift work is included in the base bid. Please consider this when submitting your proposal. As of January 19, 2024, project started in November 2022 and is now complete. *This project has been updated for historical data and reference purposes. The information has been provided as it was received and confirmed.

Occupancy

Educational

$4,000,000.00

Public - State/Provincial

New Construction, Site Work

76

35

55

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
55
Bidding Soon
704
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2022

November 1, 2022

img_map_placeholder

1901 OK-88, Claremore, OK

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.