EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 17, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Amherst, Massachusetts. Completed plans call for the renovation of a educational facility.

Whitmore Hall Mechanical Improvements Phase II Rebid Every General Bidder must submit with their bid a Certificate of Eligibility available from DCAMM along with an Update statement before the bid may be considered.The work shall be completed on or before 08/25/2023 from the Notice to Proceed and in general the Project includes: Replace original fire dampers at main duct risers. Approximately 26 locations. Minimum rates of wages to be paid on the project have been determined by the Commissioner of Labor & Workforce Development under the provisions of Sections 26 & 27, Chapter 149 of the General Laws. Wages rates are listed in the contract form portion of the specification book. Each General Bid proposal must be secured by an accompanying deposit of 5% of the total bid. Deposits shall be in the form of a BID BOND, TREASURER'S or CASHIER'S CHECK payable to the University of Massachusetts. Deposits shall be returned in accordance with the law. All Bid Deposits $ (5% of Bid Amount) Sub-bids Submitted Under Chapter 149, Section 44f, Which Are Restricted to the U.s. By One Contractor, Which Are Deemed to Be Unrealistic in That the Price Proposed is, in the Judgement of This Awarding Authority, Substantially Less or More Than the Actual Cost to Complete All of the Work Specified in That Section of the Specifications Will Be Considered as Not Responsive to the Invitation to Bid and Shall Be Rejected. (Department of Labor & Workforce Development Ruling #136 & #169). All bids for this project are subject to the provisions of either or both Massachusetts General Laws, Chapter 30, Section 39M as amended and Massachusetts General Laws, Chapter 149, Sections 44A 44I inclusive. The Awarding Authority reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Designer: Architectural Engineers Inc **General Bid Date and time (12/21/2022 at 2:00 PM ET) Project Description and Scope: Replace original fire dampers at main duct risers. Approximately 26 locations. Bidders requiring clarification or interpretation of the Contract Documents shall make a written request to jlemire@umassp.edu. T dampers. The building shall be designed and constructed so as to meet all requirements of the Massachusetts State Building Code, current edition, in addition to all other applicable codes and regulations. b. The building, which will house UMA functions is a 3-story structure, of Construction Classification IIA, for Use Group B. Functional building areas include offices, conference rooms, building lobby, common corridors, elevator cores, cafeteria/kitchen and public toilets, building supervisory offices, and mechanical/electrical utility areas housing building equipment. B. The work will include all operations necessary to deliver the building(s) and ancillary on and off site amenities in a fully installed and operable condition including all utility and site work and obtaining all necessary licenses, permits, and certificates. Where utilities exist within and adjacent to the building(s) and ancillary parking lots, and are known by the Owner, they have been shown on the site plan(s) appearing in, but not restricted to, the exhibits. Connections to these existing utility lines will be the responsibility of the General Contractor. C. The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: 1. Construction including, but not limited to: a. Phased replacement of fire dampers. This shall include demolition, new fire dampers, rework to existing fire dampers, new access doors, new fire rated gypsum board enclosures, repair to masonry walls, installation of new ductwork, etc. b. Relocation or removal and reinstallation of piping, conduit, lights, sensors, etc. to facilitate the work. c. Abatement of hazardous materials. D. Reference To Drawings: The work to be done under this Contract is shown on the Drawings listed at the end of this Section. E. Work will include all site removal and new construction for the UMA 23-10, WHITMORE HALL MECHANICAL IMPROVEMENTS PHASE II (RE-BID), UNIVERSITY OF MASSACHUSETTS AMHERST including HVAC work and electrical work as required. The General Contractor will provide a schedule for completion of the project to the Owner within the required construction period

Bid Results

Educational

$998,700.00

Public - State/Provincial

Renovation

20

15

4

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Duct Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
219
Bidding Soon
3,813
All Active Projects
1,687
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2023

February 7, 2023

img_map_placeholder

Multiple Locations, Amherst, MA


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Whitmore Hall Mechanical Improvements Phase II (Re-Bid) - GC bid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.