BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Chestermere, Alberta. Conceptual plans call for site work for a water / sewer project.

The infrastructure includes approximately 150m of watermain, 600m of 750mm trunk sewer, the flow control structure at the Splitter Manhole,1700m of 1050 pipe conveyance system, three (3) deep earthen reservoir storage cells that CSR facility is comprised of, a pumphouse and a treatment facility to control to discharge to AEP water reuse guidelines, and 550m of 300mm forcemain to discharge the CSR storage facility. The design scope will include several stormwater system components for the CSRO and a portion of the adjacent watermain along Rainbow Road between Waterford Boulevard and the Western Headworks Canal. The stormwater infrastructure will include: - 150m of 500mm watermain from Waterford Boulevard to a stub at the WID Canal. - 600m of 750mm storm gravity trunk from Rainbow Road to the Rainbow falls underdrain. - The flow control structure/ Splitter Manhole, which is located South of the Rainbow Falls Underdrain. - 1700m (1040m already constructed) of 1050mm conveyance pipe from the splitter manhole to the CSR facility. - The CSR facility design will include three storage cells hydraulically connected with piping which may require flow controls to regulate flow transfer between the storage cells. - Pumping and treatment facility at the outlet of the CSR. TIMELINE: Request for Proposals from consultants for design services has closed and submissions are currently under review (RFP 2024-CGIUTIL-RFP-034). The deliverables for this project include a design basis memorandum, issue for construction drawings, tender package documentation and pre-tender cost estimates and regulatory approvals associated with the delivery of the CSRO and adjacent infrastructure. The owner is currently seeking proposals for project management services. Multiple tender packages will ensue for this project and construction will be phased. Further update pending award of contract. *Budget is unreleased. *This RFP is an invitation by The Utility Co. (1538974 Alberta Ltd.) The City of Chestermere has established a wholly owned municipally controlled business referred to as "The Utility Co.". The Utility Co. has contracted the City of Chestermere to provide project administration, management, and oversight on this project.

Conceptual

Water / Sewer

$26,000,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
10
Bidding Soon
295
All Active Projects
101
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2025

img_map_placeholder

Multiple Locations, Chestermere, AB

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.