BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a civil project in Springfield, South Dakota. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

As of August 15, 2022, no bids received. No definite date for the rebid. Construction of an intake facility, treatment building and components related to a proposed water treatment plant. The Owner reserves the right to reject any or all bids and to waive any informalities in the bidding and make awards to the Owners best interest, MBE (1%), WBE (4%) Bid Schedule A: Construct a new intake facility with a building, concrete work, piping, valves, fittings, pumps, electrical work, site grading, bank stabilization and intake structure in the Missouri River. Construct a new water treatment plant with equipment that has been procured and will be assigned to the Contract. The plant building will be a pre-engineered steel building with concrete, finishes and related items. Multiple items will need to be removed and disposed of throughout the site to prepare for the construction area. Site grading with topsoil removal, replacement and hydraulically applied seeding/mulch, cut and fill, and sloping the surface is required. Reconstruction of the street adjacent to the plant is required along with a new gravel access road to the intake facility. The necessary piping, valves, fittings, connections and related items are to be furnished and installed to construct the process system. Site piping, manholes, valves, fittings and connections shall be furnished and installed throughout the project area for raw water supply to the plant, finished water supply to the distribution system, drain piping back to the river and other related items. A 120,000-gallon ground storage tank shall be furnished and installed with concrete floor and footings, pipe, drain tile system, insulation system and related items. The plant building construction includes plumbing with under-floor process piping, electrical work with automatic stand-by generator, HVAC system, and related items. The Work will be substantially complete on or before December 1, 2023;General Conditions within 30 days of the Date of Substantial Completion.

Final Planning

Water / Sewer

$300,000.00

Public - City

New Construction, Site Work

121

45

4

8

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
8
Bidding Soon
155
All Active Projects
62
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2022

February 27, 2023

img_map_placeholder

To Be Determined, Springfield, SD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.