BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Effingham, Illinois. Completed plans call for site work for a water / sewer project.

The proposed work is officially known as "Jefferson Avenue Drainage" forthe City of Effingham, Effingham, Illinois. The project shall consist of directional boring 8" storm sewer along E Jefferson Avenue, removing and replacing gutter at the east end of Jefferson Avenue, installing an underdrain at the east end of Jefferson Avenue under new gutter, and other miscellaneous work. The Contract Documents, consisting of the Notice to Contractors, Special Provisions, Contract, Proposal, Notice of Award, Notice to Proceed, Change Order, Specifications, Addenda may be reviewed at the following locations: Plans, specifications and documents are on file in the office of the City Engineer of the City of Effingham, 201 E. Jefferson Avenue, Effingham, IL 62401. A surety bond for the full amount of the award is required. Failure on the part of the contractor to deliver the materials within the time specified or to do the work as specified herein will be considered just cause to forfeit the surety as provided in Article 108.10 of the State of Illinois Standard Specifications for Road and Bridge Construction, adopted January 1, 2022. The City of Effingham reserves the right to reject any or all bids, waive or not waive any informality in the bids, and to accept any bid which it deems most favorable to the City. It is anticipated that a Notice of Award of a contract will be issued within 30-to-45 days of the date bids are received and that a Notice to Proceed will be issued within 10 days of the date of the Notice of Award if contractor provides proper insurance and bonding in a timely manner. Work on this project is subject to the Prevailing Wage Act (820 ILCS 130). Prevailing Wages, as determined by the Illinois Department of Labor and the current Prevailing wage ordinance approved by the City Council, shall be paid. The submission of monthly certified payrolls to the City of Effingham will be required. Work on this project is subject to the Illinois Substance Abuse Prevention on Public Works Project Act as enacted bv PA. 95-0635.

Post-Bid

Water / Sewer

$255,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
50
Bidding Soon
793
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2022

July 14, 2022

Project location map

E Jefferson Ave, Effingham, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.