BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Aptos, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

As of August 17th, 2022, project has not been awarded. No timeline of award was established. Project is anticipated to start construction in about a week or two. The work includes the construction of Rock Slope Protection, soil-wrap slope repair, pavement repairs, guardrail installation, culvert pipe installation, revegetation, and striping. DBE Goal Percentage: 3% Project Duration: 40 Work Days Liquidated Damages: $895.00 Per Calendar Day Bid Bond Percentage: 10% Engineer's Estimated Cost: $596,070 to $596,070 Pre-Qualification for Bidders: Not Required License Type Required: A

Bid Results

Roads / Highways

$618,200.00

Public - County

Paving, Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
340
Active Projects
136
Bidding Soon
2,228
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2022

August 29, 2022

Project location map

Trout Gulch Rd, Aptos, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.