EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 11, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Cleveland, Ohio. Completed plans call for site work for a water / sewer project.

**As of August 11, 2022, project was awarded to Eclipse Co. awarded amount is $316,537.30 ** For the Stafford Basin Inlet Modifications Project. In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: This project will produce a stacked rock wall to eliminate bank erosion and address deficiencies related to scour protection at the inlet of the Stafford Basin stormwater facility. Please refer to the contract documents and the Summary of Work specification 01 11 00 for additional information. Please give yourself 10 minutes in advance of the meeting to allow yourself to get into the virtual meeting. You will be given instructions to open the software application. Once signed on, ensure microphone, speaker and screen are working. We are asking that you provide your contact information in the chat function so that we can compile an attendees list. Please include your name, company affiliation, email address, and phone number. If you are having difficulty accessing the software, please contact Sara Lader at (216) 881-6600, X6052 or (216) 973-3503. A site visit has not been scheduled for this project. Prospective bidders may visit the project site after providing NEORSD with prior notice. Drawings, Specifications and Bid Forms and subsequent addenda will be available for download from a project-specific NEORSD Sharefile site. Prospective bidders will be required to register to obtain a Sharefile account to access these documents. The NEORSD will not be responsible or liable for project addenda that are not received by the bidder due to incorrect or out-of-date contact information. The NEORSD reserves the right to reject any and all Bids, to waive any informalities or irregularities in the Bids received. Bidders shall review the Instructions to Bids and all other contract documents prior to submitting a bid for this project. Due to the project size and duration, Business Opportunity Program goals will not be set for this project. MBE/WBE/SBE firms are encouraged to participate in the prime bidding process. All questions regarding the Contract Documents shall be directed to the Project Manager for the NEORSD, Kim Colich, Manager of Stormwater Design at ColichK@neorsd.org.

Award

Water / Sewer

$316,537.00

Public - State/Provincial

Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Closeout Submittals, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furnishing Accessories, Waste Receptacles
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
94
Bidding Soon
1,273
All Active Projects
484
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2022

September 1, 2022

img_map_placeholder

To Be Determined, Cleveland, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Stafford Basin Inlet Modifications

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.