Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Gridley, California. Completed plans call for the renovation of a municipal facility.
**As of August 17, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** California Construction Authority is soliciting bids from B licensed contractors for the following public works project at the Butte County Fairgrounds in Gridley, CA: Material and labor to upgrade kitchen. To include fixtures, lighting, finishes, etc. Location- 199 East Hazel Street Gridley, CA 95948 ESTIMATED PROJECT BUDGET: $ 350,000.00 1. Create accessibly compliant entries to the building. 2. Demolish flooring and existing electrical power and lighting. Remove directconnection from 3-compartment sink. Demolish existing range, serving counters, wall shelving, and walk-in shelving. Remove existing soda dispensing and ice wells in serving counter and associated plumbing and electrical. 3. Install mop sink and hand sink at both sides. Relocate soap and paper towel to hand sink. 4. Replace flooring and bases in entirety, serving counters, wall shelving, and provide racking at walk-ins and kitchens. 5. Provide new range under existing hood (replacement matches original size and clearances) no work at hood or extinguishing system. 6. Provide new self-contained freezer, ice machine/bin, and prep sink to east kitchen. Install required floor sinks. 7. Provide all new LED lighting throughout (interior/exterior). 8. Provide all new power outlets. 9. Provide routing for existing roof condensate lines to be wasted into new floor sinks at 3-compartment sinks. 10. Change swing of entry doors. Remove security doors. Install closer and panic hardware. 11. Install FRP where shown on plans. Stainless steel to remain. Paint remainder of walls and ceiling in white semi-gloss paint. 12. All work is to be conducted around Fair activities. The Contractor is to provide a minimum of 48 hours' notice of the shutdown of any utilities to both CCA and the Fair. If shutdown of water supply impacts any fire hydrants or sprinklers, shutdown to be coordinated with local fire department. Utility shutdown time is to be kept at a minimum and be back online at end of each workday. 13. Addition as yet undetermined work may be identified. Any additional work will be conducted in accordance with Potential Change Order (PCO), presented in the General Conditions (Appendix C). 14. All work is to comply with all current applicable California Codes. 15. All work to be warrantied (materials and labor) for a minimum of one (1) year, or manufacturer period, whichever is greater. Construction work to be completed by November 18, 2022
Bid Results
Municipal
$489,750.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2022
June 28, 2022
199 E Hazel St, Gridley, CA
Related To This Project
Gridley, CA
Bid Date: Mar 21 2022
Gridley, CA
Bid Date: Feb 02 2023
Gridley, CA
Bid Date: Mar 15 2023
Gridley, CA
Bid Date: Jul 13 2023
Gridley, CA
--
Gridley, CA
--
Gridley, CA
Bid Date: Nov 21 2024
Gridley, CA
Bid Date: May 29 2019
Gridley, CA
Bid Date: Jun 15 2022
Gridley, CA
Bid Date: Apr 21 2022
Gridley, CA
Bid Date: Sep 06 2022
Santa Ana, CA
Bid Date: Aug 10 2022
Visalia, CA
--
Tustin, CA
Bid Date: Aug 17 2022
Long Barn, CA
Bid Date: Aug 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.