BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2025 at 8:00 PM

Updated April 9, 2025

Site work for a water / sewer project in Simi Valley, California. Conceptual plans call for site work for a water / sewer project.

UPDATE : This project would replace the 1 Million gallon capacity Stearns Tank No. 2 that has been in service since 1975. The Seismic Evaluation of the Waterworks Storage Tank System, conducted by Kennedy Jenks Consultants in 2020, identified that the strength of the tank shell was insufficient, the tank needs to be anchored, and a ring wall needs to be constructed to support the structure to meet current seismic code requirements. Due to the age and overall condition of the tank, staff recommends replacing the existing tank with a new welded steel tank that meets the current seismic code requirements to ensure the reliability of the system. Design is expected to be completed in March 2025 and construction is expected to be completed by February 2027. Project is in City of Simi Valleycapital budget fy FY 2024-25 -FY 2028-2029 CIP ___________________________________________________________________________________________ This project would replace the 1 Million gallon capacity Stearns Tank No. 2 that has been in service since 1975. The Seismic Evaluation of the Waterworks Storage Tank System, conducted by Kennedy Jenks Consultants in 2020, identified that the strength of the tank shell was insufficient, the tank needs to be anchored, and a ring wall needs to be constructed to support the structure to meet current seismic code requirements. Due to the age and overall condition of the tank, staff recommends replacing the existing tank with a new welded steel tank that meets the current seismic code requirements to ensure the reliability of the system. Design is expected to be completed in March 2024 and construction is expected to be completed by February 2026. This project has been included in the City of Simi Valley's FY 2024-2028 Capital Improvement Program (CIP). As of April 10, 2024, Information regarding a design team and a general contractor is not available. Design is expected to be completed in March 2024 and construction is expected to be completed by February 2026.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$2,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
482
Active Projects
207
Bidding Soon
2,942
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

To Be Determined, Simi Valley, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.