BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Simi Valley, California. Completed plans call for site work for a water / sewer project.

**As of May 10, 2022 , this project has not yet been awarded. The project scheduled to go to City Council for approval next week.** After the bid opening, bid results may be obtained by calling Jay Lukiewski, Senior Engineer/Sanitation, at (805) 583-6898. After Notice to Proceed is issued to the successful bidder, all contacts should be through Jay Lukiewski, Senior Engineer/Sanitation, at (805) 583-6898. NOTE: Please mark the outside of the envelope (and express shipment envelope, if applicable): SPECIFICATION NO. SV 22-16 EASY - ARROYO SIMI SEWER LINE REHABILITATION PROJECT, CP70200019 No contractor or subcontractor may be listed on a bid proposal for a public works project submitted on or after March 1, 2015, unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5, or unless the contractor or subcontractor qualifies for an exception from this requirement, for bid purposes only, as set forth in Labor Code section 1771.1 (a). If contractor or subcontractor believes that such an exception in 1771.1 (a) applies, it must provide the applicable exception(s) in its bid proposal. Even those contractors or subcontractors who qualify for an exception under 1771.1(a) must be registered with DIR at the time of award, if such award is made on or after April 1, 2015. No contractor or subcontractor may be awarded a contract for public work on a public works project awarded on or after April 1, 2015 unless registered with DIR pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the DIR. Questions and/or concerns regarding this project will be addressed during this meeting. A copy of the existing sewer inspection CCTV videos will be provided at the pre-bid meeting. Contractors who do not attend are responsible to obtain their own copy. Interested parties should RSVP at (805) 583-6898. Please help protect yourself and others from COVID-19 by practicing safe social distancing guidelines and wearing a face mask. SCOPE OF WORK: Project locations: Terminus of Cochran Street, Madera Road, Easy Street from Madera Road to Agate Court, Los Angeles Avenue from First Street to Patricia Street, and Patricia Street from Los Angeles Avenue to Williams Street The scope of work for the Easy - Arroyo Simi Sewer Line Rehabilitation Project (Project) is comprised of the rehabilitation of 5,569 linear feet of the existing 8-inch to 39-inch sewer pipes with cured-in-place pipe (CIPP) lining, including installation of temporary sewage bypass pumps and sewage bypass piping system, manhole cover frame replacement, sewer line point repairs, infiltration mitigation, mineral deposits removal, traffic signal video detection system installation, and all appurtenant work. The sewer segments are located in the public right-of-way and in sewer easements that are located on private property and Ventura County Watershed Protection District (VCWPD). Coordination with property owners and the City of Simi Valley (City) and VCWPD encroachment permits will be required. The expected completion time of the Project is 130 consecutive calendar days after receipt of Notice to Proceed. All prospective bidders shall abide by the provisions of the Bid Terms and Conditions listed in the project's specifications. The City reserves the right to retain all proposals for a period of 60 days after the bid opening date for examination and comparison and to delete any portion of the work from the Contract. The City reserves the right to determine and waive nonsubstantial irregularities in any proposal, to reject any or all proposals, to reject one part of a proposal and accept the other. The bid shall be balanced so that each bid item is priced to carry its share of the cost of the work and also its share of the contractor's overhead and profit. The City reserves the right to delete any bid item to the extent that the bid is qualified by specific limitation. An unbalanced bid shall be considered as grounds for rejecting the entire bid. The City further reserves the right to make award to the lowest responsive and responsible bidder as the interest of the City may require. In accordance with the provisions of Division 2, Part 7, Chapter 1 of the California Labor Code, the California Department of Industrial Relations has established the general prevailing rates of per diem wages for each craft, classification, and type of work needed to execute contracts for public works and improvements. The per diem wages published at the date the Contract is advertised for bids shall be applicable. Copies of the prevailing rate of per diem wages are on file at the California Department of Industrial Relations and are available to any interested party at portal. Future effective wage rates, which have been predetermined, are on file with the Department of Industrial Relations, and are referenced but not printed in said publication. The new wage rates shall become effective on the day following the expiration date and apply to this Contract in the same manner as if they had been included or referenced in this Contract. The contractor may substitute securities for retention monies pursuant to Public Contract Code Section 22300. Terminus of Cochran Street, Madera Road, Easy Street from Madera Road to Agate Court, Los Angeles Avenue from First Street to Patricia Street, and Patricia Street from Los Angeles Avenue to Williams Street The scope of work for the Easy - Arroyo Simi Sewer Line Rehabilitation Project (Project) is comprised of the rehabilitation of 5,569 linear feet of the existing 8-inch to 39-inch sewer pipes with cured-in-place pipe (CIPP) lining, including installation of temporary sewage bypass pumps and sewage bypass piping system, manhole cover frame replacement, sewer line point repairs, infiltration mitigation, mineral deposits removal, traffic signal video detection system installation, and all appurtenant work. The sewer segments are located in the public right-of-way and in sewer easements that are located on private property and Ventura County Watershed Protection District (VCWPD). Coordination with property owners and the City of Simi Valley (City) and VCWPD encroachment permits will be required. The expected completion time of the Project is 130 consecutive calendar days after receipt of Notice to Proceed.

Award

Water / Sewer

$3,597,806.00

Public - City

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
84
Bidding Soon
1,882
All Active Projects
821
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2022

June 27, 2022

img_map_placeholder

Multiple Locations, Simi Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.