Published August 4, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Quincy, Massachusetts. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of August 4, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** Project Number: 0234025.03, 188024.00 (18173) Miller Street, Cross Street and Furnace Avenue (MCF) Area Flood Control Project. Removal and disposal of existing drainage infrastructure, clearing and grubbing, full depth pavement reconstruction, mill and overlay, trenching, bituminous and concrete sidewalk removal and installation, remove and reset vertical granite curb, removal and replacement of existing culvert, security fence and gate, installation of a pump station, transformer vault, generator, force main, catch basins, manholes, drainage pipe, water quality units, water main improvements, gas line, electrical improvements, access drive, paving, pavement markings, bituminous driveway, bioretention basin, stone diaphragm, plunge pool, wetland replication, revegetation. The Work under this Contract includes, but is not limited to, the removal and disposal of existing drainage infrastructure, clearing and grubbing, full depth pavement reconstruction, mill and overlay, trenching, bituminous and concrete sidewalk removal and installation, remove and reset vertical granite curb, removal and replacement of existing culvert, security fence and gate, installation of a pump station, transformer vault, generator, force main, catch basins, manholes, drainage pipe, water quality units, water main improvements, gas line, electrical improvements, access drive, paving, pavement markings, bituminous driveway, bioretention basin, stone diaphragm, plunge pool, wetland replication, revegetation and all materials, equipment, services and construction inherent to the Work. o There is an open work order with National Grid for the utility connection for the pump station. o The Furnace Brook Restoration Project must be completed prior to the pump station being put online. o The Contractor is responsible for coordinating with the Quincy Police Department to develop a vehicular and pedestrian traffic control plan. o Note that an easement has been obtained at 107 Cross Street for the proposed stormwater pipe, force main and culvert replacement work.

Bid Results

Water / Sewer

$9,964,559.00

Public - City

Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
542
Active Projects
289
Bidding Soon
3,972
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2022

September 12, 2022

Project location map

Multiple Locations, Quincy, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.