BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Warm Springs, Oregon. Completed plans call for site work for a water / sewer project; and sidewalk / parking lot.

Award Details Contract Award Date: Aug 03, 2022 Contract Award Number: 75H70122P00017 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: RS4HQ6G8ZGG8 Contractor Awarded Name: BAGGETT INC Contractor Awarded Address: Madras, OR 97741-9532 USA Base and All Options Value (Total Contract Value): $34974.30 Indian Health Service - Portland Area Office is issuing Request for Quote (RFQ) 75H70122Q00025 Project Title: A. Macy Site - New Septic System & Community Water Location: 9044 Palmer Way, Warm Springs, OR 97761; Jefferson County This RFQ is being solicited as 100% Small Business Set Aside with Indian Economic Enterprises (IEE) preference under NAICS 237110, Water and Sewer Line Related Structures Construction; $39.5M Size Standard. Magnitude of Construction is $25,000 to $100,000 U.S. Department of Labor Wage Determination: OR20220009, dated 5/6/2022 is applicable to this solicitation. Quotes Due Date: July 20, 2022 no later than 2:00pm PT; Email to Robert.Miller2@ihs.gov Site Visit: See FAR 52.236-27, Site Visit Construction. Disclosure of the Magnitude: In accordance with FAR 36.204, this project is estimated to be between $25,000.00 and $100,000. B.3. Incidental Payment Items: The intent of the contract is to provide for the complete work of the project described in the contract. Unless otherwise provided, the contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, and perform all work required to complete the project in accordance with the drawings, specifications, and provisions of the contract. All other work and materials will be considered as incidental to and included in the payment for items shown. Payment for contract work will be made for each line item within the Price Schedule in accordance with Section J, Attachment J04, Measurement and Payment. B.4 SF1442, Block 24: Invoices for payment shall be sent to the COR and Contracting Officer via email and reviewed and signed by the COR (signature) prior to submission to the Contracting Officer. The signed payment invoice shall be sent via e-mail to IHS Contracting Officer for final approval. *Note: HHSAR 352.232-71, Electronic Submission of Payment Requests (Feb 2022) has been added by reference in Section I. Please follow instructions for submitting invoices by email in Paragraph B.4 until otherwise directed.* B.5. Estimated Quantities: Estimated quantities are provided in the price schedule for evaluation purposes only. The Government is not obligated to order the estimated amounts specified in the schedule. The estimates provided do not establish any minimum purchase limit for which the Government is obligated. The contractor shall not furnish quantities in excess of the specified amount without prior written consent from the Contracting Officer. B.6. Wage Determination: Davis-Bacon wages shall be paid for all applicable labor categories for each price schedule line item and should be included in all pricing in accordance with FAR 52.222-6, Construction Wage Rate Requirements. The applicable Wage Determination is included as Attachment J05 in Section J. The most current version of the applicable Wage Determination will be included at time of award. B.7. Period of Performance The contractor shall proceed and complete the work, including cleanup within 90 days after issuance of the Notice to Proceed (NTP). The award is not the NTP for this contract work. Contract completion can be adjusted for any long lead items if requested in writing to the Contracting Officer. The contractor must not commence work until it has been issued a NTP. The award is not the NTP for this contract work. Prior to issuance of a NTP, the contractor must submit for approval performance and payment bonds, a project schedule showing the date when on-site work will begin, the date the work will be completed, and all required insurance. No work will be performed on Saturdays, Sundays, federal holidays, or Tribal holidays without the Government's consent. B.8. Contract Specific Terms & Conditions B.8.1. Bid Bond: A Bid Guarantee IS NOT required. B.8.2. Payment and Performance Bonds ARE NOT required in accordance with FAR 28.102-2. B.8.3. FAR Clause 52.228-13, Alternative Payment Protections IS NOT applicable UNLESS the value of the award exceeds $35,000 in accordance with FAR 28.102-3(b). B.8.4. Questions regarding the solicitation and project must be submitted in writing to Robert S. Miller, Contracting Officer, via e-mail at Robert.Miller2@ihs.gov. Questions will be accepted up to 7 days before quote due date. The Government is not obligated to answer any questions submitted after this date. B.8.5. Furthermore, all questions shall be submitted by the prime contractor(s) on behalf of their subcontractor(s) and supplier(s) to the contract Specialist. Questions submitted by subcontractors and/or suppliers directly to the contract specialist will be rejected and not answered. B.8.6. Quote Due Date: Quotes are to be submitted via e-mail to the assigned Contract Specialist/Contracting Officer by the date and time indicated in Block 13 of the SF1442. B.8.7. Quote Acceptance Period: Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. B.9 Other Important Information: Under no circumstances will any oral statements made be binding upon the Government unless such statements or agreements are issued in writing by the Contracting Officer. Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed within the change and shall immediately notify the Contracting Officer. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$34,974.00

Public - Federal

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
8
Bidding Soon
174
All Active Projects
89
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2022

August 19, 2022

img_map_placeholder

To Be Determined, Warm Springs, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.