BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2022 at 8:00 PM

Updated February 13, 2024

Renovation of a medical facility in Pipestone, Minnesota. Completed plans call for the renovation of a medical facility.

This project includes renovations of an existing resident serving kitchen, dining room and living room at the main level of the Hospice House. Work under this contract includes: Interior Finishes o Insulated gypsum board/wood stud partitions o Floor finishes of carpet and luxury vinyl tile o Wall finishes of paint and ceramic tile. o Ceiling finishes of acoustical lay-in tile, gypsum board and gypsum board soffits. o Plastic laminate casework, quartz, and solid surface. Mechanical Systems o Plumbing including, supply and waste piping systems, piping insulation, plumbing fixtures. Ventilation to include, ductwork, duct insulation, grilles, registers, diffusers, and test and balance. Electrical Systems o Electrical conduit and wiring o Interior lighting. o Fire alarm and voice/data Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to Pipestone County Medical Center in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to enter into a written contract and to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. Before commencing work, the successful bidder shall provide a certificate of insurance showing coverage for public Liability, property damage, and workers' compensation for at least the statutory minimum amounts and naming the Owner as an additional insured. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Owner requires Substantial Completion of the project three (3) months from the awarded bid. Schedule to be coordinated with the owner to avoid product delays prior to demolition. All materials/products will be required to be on- site prior to demolition. Final schedule to be confirmed with the selected contractor. Contact Pete Swanson, Facility Services Manager, at 507-825-6055 if you desire to see the site.

Bid Results

Medical

$173,641.00

Public - County

Renovation

24

20

2

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
24
Bidding Soon
402
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2022

July 22, 2022

Project location map

309 10th St SW, Pipestone, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.