BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fire / police facility in Holton, Indiana. Working plans call for the construction of a 2,336-square-foot fire / police facility; and for site work for a fire / police facility.

**As of 4/20/2023 Per Town, Project on hold until they can see if above-ground shelter is feasible, instead of in-ground structure** After review and award of a contract, the Owner will provide a "Notice to Proceed" to the Contractor. Contractor will then have 10 working days after said "Notice to Proceed" to commence construction and 180 days total to achieve substantial completion and an additional 30 days to complete all work for this project, for a total of 210 days after issuance. of "Notice to Proceed" to project closeout. Substantial completion date is therefore anticipated to be NOVEMBER 20, 2023, and final completion date is therefore anticipated to be DECEMBER 20, 2023, based on a Contract approval by MAY 10, 2023, and Notice to Proceed dated MAY 20, 2023. Contractor will be assessed $300.00 a day liquidated damage. for any work remaining over and above either of the specified contract completion dates. Payment to be made on a standard monthly claim basis, with 10% retainage, and said. retainage may be held up to three months after the successful completion of this contract. The successful bidder shall furnish a Performance and Labor and Materials Payment Bond in an amount equal to one hundred percent (100%) of the contract sum with an approved surety company. Bids must be submitted on the forms in the Contract Documents and other conditions therein described must be met. Each bid must be enclosed in a sealed envelope, clearly marked TOWN OF HOLTON STORM SHELTER on the face of the envelope and display the name and address of the bidder. Each bid must be accompanied by a Bid Bond or Certified Check in a sum equal to 5% of the amount of the bid unless otherwise specified, and a completed Non-Collusion Affidavit. Bid prices must be firm for a period of ninety (90) days. from the bid opening date. Should a successful bidder withdraw his bid or fail to execute a satisfactory contract within ten (10) days after notice of acceptance of his bid, the owner. may declare the Bid Security forfeited as liquidated damages, not as penalty. The successful bidder shall furnish a Performance and Labor and Materials Payment Bond in an amount. equal to one hundred percent (100%) of the contract sum with an approved surety company. Said bond shall remain in full force and effect for a period of one (1) year after date of final. acceptance of the work Bidders on this work shall be required to comply with the provisions of the President's Executive Order No. 11246, as amended. The Bidders shall also comply with the requirements of 41 CFR Part 60 - 4 entitled Construction Contractors - Affirmative Action Requirements. A copy of 41 CFR Part 60 - 4 may be found in the Supplemental General Conditions of the Contract Documents and Specifications. The bidder's attention is also called to the "Minority/Women Business Participation" requirements contained in the Project Specifications. The Federal Emergency Management Agency (FEMA) has adopted a state goal of 10% for minority and female owned businesses for construction related or purchase related contracts for the work. Questions received less than seven days prior to the date for opening of Bids may not be answered. In accordance with the Davis-Bacon requirement all contractors and subcontractors are required to pay not less than the prevailing wage rates listed on the federal wage determination for each classification of work performed on the project

Final Planning

Fire / Police

$649,222.00

Public - City

New Construction, Site Work

12

23

5

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
144
Bidding Soon
2,516
All Active Projects
1,218
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 12, 2023

July 3, 2023

December 20, 2023

img_map_placeholder

7043 US-50, Holton, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.