BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

The work includes removal and replacement of two existing 18" surge anticipator valves at the NBPS and removal and replacement of two existing 20" surge anticipator valves at the SBPS, along with valve control panels and instrumentation integration with existing ECCV SCADA systems. The Work will be substantially completed on or before March 8, 2023, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before April 30, 2023

Post-Bid

Water / Sewer

$100,000.00

Public - County

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
79
Bidding Soon
1,319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2022

July 29, 2022

Project location map

Multiple Locations, Aurora, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.