EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 27, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Montgomery, Pennsylvania. Completed plans call for site work for a water / sewer project.

Any questions requiring clarification will be addressed in an Addendum. Requests for interpretations or clarifications are due the 14th day of June 2022. Any questions requiring clarification will be addressed in an Addendum. Clarification Deadline 6/14/2022 5:00 PM The project consists of furnishing all labor and materials necessary for final closure cap system construction over approximately twenty-two and four tenths (22.4) acres of the landfill, new landfill gas system improvements and modifications to the existing system, installation of new landfill utilities and modifications to existing utilities to suit final closure, and all miscellaneous related landfill and site work included in the Bidding Documents. Work associated with this project will be completed over two construction seasons, 2022 and 2023, with construction milestone deadlines for specific components of work outlined in the Summary of Work. Landfill final closure cap system work consists of: Preparation of intermediate cover subbase for cap installation; Construction of twenty-two and four tenths (22.4) acres final capping system consisting of HDPE geomembrane system, with a composite geonet drainage layer, a composite geonet underdrain, and final cover soil; Construction of surface water drainage swales and downchutes; and all associated earthwork and site restoration. Landfill gas system modifications and improvements consists of: Installation of sixteen (16) landfill gas wells; Installation of wellheads and pumps; Installation of landfill gas header and lateral piping; installation of air lines and condensate forcemain piping for landfill dewatering; Installation of three (3) HDPE landfill gas condensate knockout manholes, modifications to existing landfill gas infrastructure and modification of two (2) HDPE condensate knockout manholes, including all associated piping and pumps; and installation of all associated utility and landfill gas piping to connect the new landfill gas wells to the existing landfill gas system, compressed air to the well pumps, and force main discharge piping. Landfill and site utilities modifications and improvements consists of: Decommissioning and removal of existing leachate system, landfill gas system, hot water, stormwater, electrical, and communication utilities; Construction of two (2) leachate system control station structures including all associated piping and components; Installation of single and dual contained leachate force main systems; modifications to existing leachate pump station structures; stormwater infrastructure modifications and improvements; Integration of new utility infrastructure to the existing landfill system; all electrical work to provide a complete and operational system; Modification of hot water supply and hot water return piping; and all associated earthwork and site restoration to facilitate landfill utilities modifications and to suit closure. The work is to be substantially completed for Owner's use within 480 calendar days from the date specified in the Notice to Proceed. Liquidated damages of $2,000.00 per calendar day will be assessed after the date for Substantial Completion. Final completion of the work shall be within 540 calendar days from the date specified in the Notice to Proceed. Liquidated damages of $1,000.00 per calendar day will be assessed after the date for Final Completion. Bids will be received for a single prime Contract. Bids shall be on a lump sum basis, as indicated in the Bid Form. For information concerning the proposed work, contact John J. Wood, P.E., Barton & Loguidice, D.P.C., 3901 Hartzdale Drive, Suite 101, Camp Hill, PA 17011, jwood@bartonandloguidice.com. Each Bid must be submitted on the prescribed Bid Form and accompanied by Bid security, as prescribed in the Instructions to Bidders. The Successful Bidder will be required to furnish the additional bond(s) prescribed in the Bidding Documents. In order to perform public work, the Successful Bidder and Subcontractors prior to Contract award shall hold or obtain such license as required by State statutes, and Federal and local Laws and Regulations. Wages paid to employees of the successful bidder shall be subject to the requirements of the Pennsylvania Prevailing Wage Act. No Bidder may withdraw their Bid within sixty (60) days after the actual date of the opening of Bids. The County will not award a contract to anyone who cannot prove to the satisfaction of the County that they have sufficient experience in landfill construction and closure, and are financially able and organized to successfully carry out the work covered by the Bidding Documents in the required time. Each Bid shall be accompanied by completed questionnaires relating to the Bidder's qualifications and financial status. The County reserves the right to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents, to waive any informality in Bids received, and to accept that Bid which in its judgement best serves the interest of the County.

Post-Bid

Water / Sewer

$300,000.00

Public - County

Site Work

61

19

67

5

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Fire and Smoke Protection, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
68
Bidding Soon
825
All Active Projects
369
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2022

July 25, 2022

img_map_placeholder

447 Alexander Dr, Montgomery, PA

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Phase 1 Closure

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.