Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 11, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Woodmohr, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Crack filling 117th Street, 97th Street on the North End, 147th Ave by the bridge and 142nd Street. Each section of road will be a separate bid. Bids must be completed on the township's bid form and will only be accepted on this form. The Town Board reserves the right to reject any or all bids and accept bid most advantageous to the town. Completion date of project shall be negotiated at time of contract awards.

Bid Results

Roads / Highways

$4,566.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
59
Bidding Soon
717
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2022

July 15, 2022

Project location map

Multiple Locations, Woodmohr, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed