Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Geneva, Illinois. Contact the soliciting agency for additional information.
The City of Geneva, Illinois, is requesting proposals for construction material testing services to be performed between July 1, 2022 and June 30, 2023. The bulk of the construction material testing typically will be done between July 2022 and November 2023. The estimated quantities that will need testing for the bulk of the work is as follows: 12,000 tons of HMA; 5,000 sq. ft. of sidewalk; 4,000 linear feet of curb. A map and a list of the streets where the bulk of the construction material testing will be needed are attached. The City of Geneva has limited funds available to complete this project, therefore notice is hereby given that the City of Geneva reserves the right to make changes to the scope of work or to reject all proposals. These changes shall not be reason for any adjustment to the unit prices. The requested schedule of fees is not a statement that all items and services listed on the schedule will be utilized in this project. Furthermore, if there are any additional costs that is not shown on your schedule of fees or listed in the proposal documents (e.g. millage; trip charge or equipment charges...) they shall be included in your submittal. Any costs that are typically charged but are not included in your submittal, will not be allowed if your firm is awarded this project. Please show overtime and weekend hourly rates also. Contractor acknowledges that the Freedom of Information Act, 5 ILCS 140/1 et seq. (the "Act") places an obligation on the City of Geneva to produce certain records that may be in the possession of the Contractor. Contractor shall comply with the record retention and documentation requirements of the Local Records Retention Act 5 ILCS 160/1 et seq. and the Act and shall maintain all records relating to this contract in compliance with the Local Records Retention Act and the Freedom of Information Act (complying in all respects as if the Contractor was, in fact, the City). Upon notice from the City, Contractor shall review its records promptly and produce to the City within two business days of said notice from the City the required documents which are responsive to a request under the Act. If additional time is necessary to comply with the request, the Contractor may request the City to extend the time do so, and the City will, if time and a basis for extension under the Act permits, consider such extensions. In the event Contractor fails to produce the requested records or fails to produce the requested records within the time period required above and the City is assessed a fine, fee or penalty for failure to timely comply with the Act do to Contractor's actions, Contractor shall reimburse City for all fines, fee or penalties, including reasonable attorney's fees, paid by the City. The attached map and list of streets shows where the bulk of the construction material testing will be needed. There will also be other City projects where construction material testing will be needed. The above referenced projects will need material testing for bituminous resurfacing, roadway reconstruction, PCC sidewalk and PCC Curb & Gutter replacement, roadway patching and the density of aggregate bases. All work shall be done according to "The Illinois Highway Code"; the Manual of Test Procedures of Material; the Illinois Department of Transportation Standard Specifications for Road and Bridge Construction, herein after referred to as the Standard Specifications (adopted January 1, 2022) and the current "Supplemental Specifications" in so far as they apply.
Post-Bid
Municipal
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 27, 2022
July 1, 2022
Multiple Locations, Geneva, IL
Related To This Project
Geneva, IL
Bid Date: Jun 30 2022
Geneva, IL
Bid Date: Jun 13 2022
Geneva, IL
Bid Date: Jun 28 2022
Geneva, IL
Bid Date: Aug 19 2019
Geneva, IL
Bid Date: Jul 05 2022
Geneva, IL
Bid Date: Jul 05 2022
Geneva, IL
Bid Date: May 24 2022
Geneva, IL
--
Geneva, IL
Bid Date: May 06 2022
Geneva, IL
Bid Date: Jun 01 2022
Geneva, IL
Bid Date: Jun 01 2022
Geneva, IL
Bid Date: Jun 13 2022
Geneva, IL
Bid Date: Jun 13 2022
Geneva, IL
Bid Date: May 20 2022
Geneva, IL
Bid Date: Jun 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.