EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Dayton, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Description of Improvement: This project will install a concrete path to connect Frontage Street to the library, a walking path around Wright Factory Site, the grading, top soiling and seeding of Wright Factory Site, and the demolition of abandon items contained on site and items incidental there to. Location WRIGHT FACTORY SITE RECREATIONAL PATHS AND SITEWORK (25% HUD SECTION 3 WORKER LABOR HOURS & 5% TARGETED WORKER LABOR HOURS) (FEDERAL CDBG FUNDS) Bids will be received by the Director of Public Works of the City of Dayton, State of Ohio for the following improvement: Wright Factory Site Recreational Paths and Sitework (25% Hud Section 3 Worker Labor Hours & 5% Targeted Worker Labor Hours) (Federal CDBG Funds) The purpose of the pre-bid conference is to explain Section 35.14, 35.15 and 35.16 of the City of Daytons Revised Code of General Ordinances (R.C.G.O.) regarding Equal Employment Opportunity and various rules and regulations of the Section 3 Final Rule Implemented by the U.S. Department of Housing and Urban Development. On November 30, 2020, the U.S. Department of Housing and Urban Development implemented the Section 3 Final Rule which shifted the focus of the provision from new hires for temporary opportunities, to long-term employment and job permanency for low-income workers (Section 3 workers). Section 3 is a provision of the Housing and Urban Development Act of 1968 (12 U.S.C. 1701u) that is regulated by the provisions of 24 CFR 75. Section 3 regulations ensure that employment and other economic opportunities generated by certain HUD financial assistance shall, to the greatest extent feasible, and consistent with existing Federal, State and Local laws and regulations, be directed to low- and very low-income persons, particularly those who are recipients of government assistance for housing, and to business concerns which provide economic opportunities to low- and very low-income persons As required by the Section 3 Final Rule, 25% of all labor hours spent on this project must be performed by a Section 3 worker, and 5% of all labor hours spent on this project must be performed by Targeted Section 3 workers. This information will be reported back to the City on an annual basis. Additional information and definitions pertaining to the Section 3 Final Rule can be found in the bidding documents. Under the Agreement resulting from this offer, the Contractor must comply with all Section 3 Requirements.

Award

Roads / Highways

$596,885.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs, Multiple Seating, Portable Audience Seating, Stacking Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
58
Bidding Soon
1,335
All Active Projects
519
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

August 1, 2022

img_map_placeholder

Multiple Locations, Dayton, OH

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Wright Factory Site Recreational Paths and Sitework

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.