Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Hayden, Idaho. Completed plans call for the construction of a 8,272-square-foot transportation facility; for site work for a transportation facility; for paving for a transportation facility; water / sewer project; water / sewer project; pre-engineered storage facility; pre-engineered storage facility; and pre-engineered storage facility.
As of July 11, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Budget estimate is between $2.5 and $3.0 million. Work associated with proposed improvements is generally described as follows: Schedule A: Snow Removal Equipment (SRE) Building Schedule B: Paving of Approaches and Asphalt Patch Schedule C: Sewer Extension, Oil Water Separator, Concrete Floor, Floor Drain Schedule D: Windows Schedule E: Water Extension, Spigot, Fire Hydrant Snow Removal Equipment Building consists of all elements necessary to construct a pre-engineered metal building for storage of the airport's snow removal equipment. Work generally consists of the construction of a Snow Removal Equipment Building (approximate gross size 8,272 sft) with associated utility extensions, and vehicle access to taxiway and roadway. Work includes sitework to construct the new building to include: surveying, erosion control, excavation, embankment, subbase course, base course, asphalt paving, stormwater modifications and improvements, utility work, topsoil, seeding and other miscellaneous items. Building items include foundation and floor concrete, steel supply and erection, insulation, glass, overhead and man doors, HVAC, roofing, and electrical. The work shall be complete and ready for final inspection in three hundred sixty-five (365) calendar days for Schedule A work. A site visit is available at the Contractor's request. Please call 208-446-1860 forty-eight hours in advance of desired visit to coordinate a time with airport operations. No questions may be directed to the airport staff during site visit. Each bidder must supply all the information required by the Bid Documents and Specifications. All prospective bidders are directed to the Instructions for Bidders for discussion of Bid policies, procedures, and requirements. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. 3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the sub Contractor; employer identification number of the sub Contractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed. 4. As used in this notice and in the contract resulting from this solicitation, the "covered area" is the State of Idaho, Kootenai County, and the City of Hayden. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$1,783,000.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 28, 2022
August 29, 2022
10375 N Sensor Ave, Hayden, ID
Related To This Project
Hayden, ID
Bid Date: Feb 28 2022
Hayden, ID
Bid Date: Mar 29 2022
Hayden, ID
Bid Date: May 15 2020
Hayden, ID
Bid Date: Jun 04 2021
Hayden, ID
Bid Date: Mar 24 2020
Hayden, ID
Bid Date: Dec 10 2019
Hayden, ID
--
Hayden, ID
Bid Date: Oct 08 2020
Hayden, ID
--
Hayden, ID
Bid Date: Mar 14 2022
Hayden, ID
Bid Date: Mar 25 2022
Hayden, ID
Bid Date: Jul 13 2021
Hayden, ID
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.