BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Hayden, Idaho. Completed plans call for the construction of a 8,272-square-foot transportation facility; for site work for a transportation facility; for paving for a transportation facility; water / sewer project; water / sewer project; pre-engineered storage facility; pre-engineered storage facility; and pre-engineered storage facility.

As of July 11, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Budget estimate is between $2.5 and $3.0 million. Work associated with proposed improvements is generally described as follows: Schedule A: Snow Removal Equipment (SRE) Building Schedule B: Paving of Approaches and Asphalt Patch Schedule C: Sewer Extension, Oil Water Separator, Concrete Floor, Floor Drain Schedule D: Windows Schedule E: Water Extension, Spigot, Fire Hydrant Snow Removal Equipment Building consists of all elements necessary to construct a pre-engineered metal building for storage of the airport's snow removal equipment. Work generally consists of the construction of a Snow Removal Equipment Building (approximate gross size 8,272 sft) with associated utility extensions, and vehicle access to taxiway and roadway. Work includes sitework to construct the new building to include: surveying, erosion control, excavation, embankment, subbase course, base course, asphalt paving, stormwater modifications and improvements, utility work, topsoil, seeding and other miscellaneous items. Building items include foundation and floor concrete, steel supply and erection, insulation, glass, overhead and man doors, HVAC, roofing, and electrical. The work shall be complete and ready for final inspection in three hundred sixty-five (365) calendar days for Schedule A work. A site visit is available at the Contractor's request. Please call 208-446-1860 forty-eight hours in advance of desired visit to coordinate a time with airport operations. No questions may be directed to the airport staff during site visit. Each bidder must supply all the information required by the Bid Documents and Specifications. All prospective bidders are directed to the Instructions for Bidders for discussion of Bid policies, procedures, and requirements. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. 3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the sub Contractor; employer identification number of the sub Contractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed. 4. As used in this notice and in the contract resulting from this solicitation, the "covered area" is the State of Idaho, Kootenai County, and the City of Hayden. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$1,783,000.00

Public - County

New Construction, Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
16
Bidding Soon
341
All Active Projects
100
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 28, 2022

August 29, 2022

September 5, 2023

img_map_placeholder

10375 N Sensor Ave, Hayden, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.