BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Flagstaff, Arizona. Contact the soliciting agency for additional information.

Project Name: ADOT Pedestrian and Bicycle Northwest Group RSA Project Project (TRACS) Number: M7200 01X District: Statewide Route/MP: Various Funding Source: HSIP Safety Assessment of various high pedestrian and bicycle crash intersections and segments of the state highway system. Project will include analysis of crash characteristics, current operational data (speed and volume of vehicle pedestrian and bicycle traffic), and planned construction and projected future operational characteristics. Work includes field review of locations and may require survey of existing roadway configurations. ADOT is interested in demonstrating cause and effect relationships between proposed solutions and expected outcomes. As such, the intent of these RSAs is to develop proposed solutions for documented pedestrian and bicycle crash histories that can be translated directly into future state funded projects or Highway Safety Improvement Program (HSIP) applications Final report will include: 1. Recommendations for possible low-cost, near-term changes to the road characteristics to improve safety and operations. 2. Crashes likely affected by implementation of these changes 3. Crash modification factors (CMF) from FHWA CMF Clearinghouse or approximate CMFs based on peer reviewed literature for the proposed changes 4. Concept level design estimates of the changes 5. Concept level benefit cost ratios of proposed changes 6. Review and comment on the adequacy or appropriateness of existing ADOT pedestrian and bicycle standards implemented at the RSA site A Road Safety Assessment (RSA) is a formal safety performance examination of an existing or future road or intersection by an independent multidisciplinary team. It qualitatively estimates and reports on potential road safety issues and identifies opportunities to eliminate or mitigate concerns. The RSA team studies the location from a variety of perspectives, uncovering road safety issues and identifying opportunities for safety improvements. This RSA project will include Northwest Group locations. The work includes evaluation of possible low-cost safety countermeasures to improve safety and capacity. FHWA Road Safety Audit Guidelines in conducting RSA should be used. Northwest Group includes: Northwest SR 95/Joy Lane - MP 236.5 (Pedestrian Safety Action Plan (PSAP) - High Crash (HC), Transportation Systems Management and Operations (TSMO)) Fort Mohave SR 95 MP 244-249 (Bicycle Safety Action Plan (BSAP) - HC and High Risk (HR)) Bullhead City SR69 MP 286-289.7 (PSAP - HR) Prescott Valley US 60: MP 143-146.3 (BSAP - HC and HR, PSAP - HC and HR, TSMO) NE Phoenix Metro PSAP: US 60 MP 143.0-145.0, HC Segment 13 PSAP: US 60 MP 145.0-146.3, HR Segment 10 US 60/Bethany Home (PSAP - HR, TSMO) NE Phoenix Metro Questions, in writing, shall be received by ECS at the below email address until 06/15/2022 at 2:00 P.M. (Arizona Time). No further questions shall be accepted after the time specified. The method of contractor selection has not been determined at this time. AZ DOT - RFQ - Project Development On-Call - ADOT Pedestrian and Bicycle Northwest Group RSA Project

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
6
Bidding Soon
115
All Active Projects
51
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 20, 2022

img_map_placeholder

Multiple Locations, Flagstaff, AZ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.