BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Ocala, Florida. Completed plans call for the demolition of a residential development; and for site work for a residential development.

The City of Ocala is seeking quotes from contractors to demolish and remove a Concrete Block Structure, fence remove junk and cut and clean lot located at 2130 NW 1st ST, Ocala, FL 34475. Notice of Demolition must be sent to FDEP and City of Ocala permit applied for within two (2) business days after issuance of NTP. The requirements for this listing are outlined in the exhibits. Bids will be received on a lump sum basis and shall include all costs necessary to complete this project (travel costs, permitting fees, disposal, etc.). Permit allowance is $104. Please include this allowance amount in your lump sum bid amount. Award will be made to the lowest bidder meeting all requirements outlined herein. Formal Question Due By: 6/8/2022 @ 5:00 PM EST This project consists of the following: 1. Termination of water and sewer connections at the property line (city meter/sewer laterals) prior to beginning demolition work. 2. Demolition and removal of a concrete block structure, overgrowth, structural debris, structure contents, improvements, and any junk on the property listed above. 3. Underbrush, overgrowth, and all debris must be removed from the property. All trees, except for those that are dead, shall remain. 4. Property shall be graded to final grade, using a box blade. 5. The ground where the buildings are removed will be leveled, and if on a grade, sodded. 6. Any fuel tanks found must be pumped, disconnected, crushed, and backfilled or pumped and completely removed from the property according to Chapter 62-761 of the Florida Administrative Code. 7. Public sidewalks and driveway aprons must remain intact. Any damage to sidewalks or driveway aprons by the Contractor will be repaired at the Contractor's expense. 8. Any septic tanks will be pumped, crushed and back-filled, according to City requirements, Florida Building and Plumbing codes, and the Marion County Health Department. 9. Any water wells will be capped according to City requirements and Florida Building and Plumbing codes. 10. All items will be removed from the property and properly disposed of. NO items will be buried. Contract Time: Work must be completed and ready for final inspection within 60 days of the Cityissued Notice to Proceed (NTP).

Award

Residential Subdivision

$10,095.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
89
Bidding Soon
1,248
All Active Projects
500
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2022

July 8, 2022

img_map_placeholder

2130 NW 1st St, Ocala, FL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.