BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in San Francisco, California. Completed plans call for the renovation of a water / sewer project.

This work will be performed at the Southeast Treatment Plant. This is an operating wastewater plant with extensive above- and below-grade infrastructure that must remain in continuous operation at all times. A brief description of the Scope of works. Trade Contractor to provide all glazing, curtain wall, windows, skylight, storefront assemblies, both interior and exterior. Facility 600 is a 5-storey structure with an approximate 100,000 sq. ft. floor area with channel glazing called out for the north and south stairwells, curtain wall at the northeast and south elevations at level 4, storefront on all sides of the exterior and throughout the interior. Included are all items required for a functioning system, but not limited to, aluminum window fins, automatic doors, operators, actuators, pedestals that fall within any storefront/glazing assembly, air barriers, membranes, caulking, and flashing. There are design-build requirements. Applicants who pre-qualify as Bidders are hereby notified that work to be performed under this contract will be in full or in part financed by the Clean Water State Revolving Fund (SRF), administered by the United States Environmental Protection Agency (US EPA) and the State Water Resources Control Board (SWRCB), and the Water Infrastructure Finance and Innovation Act (WIFIA), also administered by the US EPA. Applicants who pre-qualify as Bidders are required to seek, and are encouraged to use, Disadvantaged Business Enterprises (DBEs) for their subcontracting and procurement needs. These requirements apply to all subcontracts for equipment, supplies, construction, and services. The SFPUC has adopted the following Fair Share Objectives for participation of DBEs in this SRF funded project. These are project-wide participation goals that the Contractor may seek to meet: 1. 5.6% MBE 2. 1.2% WBE The project wide goal for Local Business Enterprise participation for the Project is 12% of the Contract Sum. The Local Hiring Goal for the Construction Phase of the Project is 30% and 50% for apprentices for each trade. In accordance with California Labor Code Sections 1771.1 and 1725.5, no contract can be awarded to a Bidder without proof that the Bidder and all identified subcontractors are currently registered with the California Department of Industrial Relations. The BDFP Project team, in partnership with the City of San Francisco Contract Monitoring Division ("CMD") and the San Francisco Public Utilities Commission ("SFPUC") is committed to fostering strong, sustainable, and vibrant communities in the neighborhoods that we serve. The BDFP Project team is committed to providing certified Small & Micro Local Business Entities ("LBE") within Bayview Hunters Point ("Hyper-Local LBE") with meaningful opportunities to participate on the BDFP Project. We strongly encourage bidders to support the community by utilizing Hyper-Local LBEs to fulfil the LBE participation requirement.

Under Construction

Water / Sewer

$200,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
81
Bidding Soon
1,792
All Active Projects
745
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2022

August 8, 2022

img_map_placeholder

Multiple Locations, San Francisco, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.