Site work and paving for a mixed-use development in Hibbing, Minnesota. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

The project scope consists of the following construction elements: Turf Grading Drainage Erosion Control Electrical Paving Pavement Markings The Notice to Proceed for construction is anticipated to be issued in Summer 2023. Bid Proposals shall be submitted on forms furnished for that purpose. The schedule of minimum wages as established by the Secretary of Labor and set forth in the specifications is to govern on this project, and bids shall be based on these established minimum wage rates. In accordance with Minnesota law, overtime must be paid for work in excess of 8 hours per day or 40 hours per week. The bidder/offerer certifies, by submission of this proposal or acceptance of this contract, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by a Federal department or agency. It further agrees by submitting this proposal that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts and subcontracts. Where the bidder/offerer/contractor or any lower tier participant is unable to certify to this statement, it shall attach an explanation to this solicitation/proposal. Notice of Requirements for Affirmative Action to Ensure Equal Employment Opportunity - State of Minnesota Requirements: The offerer's or bidder's attention is called to the "equal opportunity clause" set forth herein. The goals and timetables for minority and female participation, expressed in percentage terms for the contractor's aggregate workforce in each trade on all construction work in the Covered Area as follows: Goals for minority participation in each trade, 3.0%; goals for female participation in each trade, 6.9%. These goals are applicable to all contractors' construction work performed in the Covered Area. The bidder shall make good faith efforts as defined in Appendix A of 49 CFR Part 23, Regulations of the Office of the Secretary of Transportation to subcontract Three and thirty onehundredths percent (3.30%) of the dollar value of the contract to small business concerns owned and controlled by socially and economically disadvantaged individuals (DBE). The individuals who are presumed to be socially and economically disadvantaged include Women, Blacks, Hispanics, Native Americans, Asian-Pacific Americans, and Asian-Indian Americans. In the event that the apparent successful bidder of this solicitation qualifies as a DBE, the contract goal shall be deemed to have been met. Bidders will submit, in writing, the names of the DBEs included in their bid, a description of the work DBEs will perform, and the dollar value of each DBE subcontract. Exclusive agreements between DBEs and bidders are forbidden. Chisholm-Hibbing Airport Authority reserves the right to waive failure of a bidder to meet the DBEs goals if sufficient effort as determined by Chisholm-Hibbing Airport Authority has been made to comply with the DBE goals and the requirements are not met. The bids shall be accompanied by an Affidavit on Non-Collusion and written assurance that the bidder has made a good faith effort towards meeting DBE goals. Each bid proposal shall be accompanied by a "Bid Security" in the form of a certified check made payable to the Chisholm-Hibbing Airport Authority in the amount of not less than 5% of the total bid or a surety bond in the amount payable to the Airport Authority with the surety company thereon duly authorized to do business in the State of Minnesota, such Bid Security to be a guarantee that the bidder will not, without the consent of the Airport, withdraw his bid for a period of 60 days after the opening of bids, and if the successful bidder, will enter into a contract with Chisholm-Hibbing Airport Authority and in connection therewith, give Public Contractor's Bond as required by law; and the amount of the certified check will be retained or bond enforced by the Airport in case the bidder fails so to do. The Bid Security of the three lowest bidders will be retained until the contract is executed, but in no event longer than 60 days provided that the Bid Security of the lowest responsible bidder shall be retained in any event until the contract is executed and Public Contractor's Bond furnished as herein provided. The bid of the lowest responsible bidder, provided said low bidder has made a good faith effort to meet the DBE contract goal will be accepted on or before the expiration of 60 days after the date of the opening of bids. In the event that the Authority deems it in its best interest to delay the award of the contract (i.e. if the federal funding for the project is delayed) the 60 day time period may be extended for up to one year if mutually agreed upon by both the bidder and the Authority. The Authority, reserves the right to reject any or all bids and to waive any minor irregularities, informalities or discrepancies The CHAA, reserves the right to reject any or all bids and to waive any minor irregularities, informalities or discrepancies. Document - (Email: Darren.Christopher@rsandh.com Phone: 218-722-1227). Payment for hard sets will not be refunded.

Post-Bid

Transportation Terminals

$3,000,000.00

Public - City

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Temporary Construction, Vehicular Access and Parking, Haul Routes, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Other Specialties, Flags and Banners, Flags
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts, Concrete Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
11
Bidding Soon
172
All Active Projects
68
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2022

June 21, 2023

img_map_placeholder

11038 MN-37, Hibbing, MN


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

HIB Runway Safety Area (RSA) Grading and Drainage Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.