BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a mixed-use development in Dixon, Missouri. Completed plans call for the renovation of a educational facility.

The following is added: Bid security shall be in the form of a bid bond in an amount equal to at least Five Percent (5%) of the total amount of the bid. Bid security shall be made payable to the Owner. Bids submitted without the bid security will not be considered. The following is added: The successful Bidder shall furnish a Performance Bond in a amount equal to One Hundred Percent (100%) of the total Contract Sum as security for the faithful performance of each Contract. The successful Bidder shall furnish a Material and Payment Bond in an amount equal to One Hundred Percent (100%) of the total Contract Sum as security for the payment of persons performing labor and/or furnishing materials in connection with each Contract. Each bond shall be issued by a surety licensed to do business in the State in which the Project is located; each surety and bond is subject to the approval of the Owner. The form of agreement shall be executed in triplicate by the Architect within five (5) working days of written notice from the Owner of the award of the Contract for the project. The Contractor and the Contractor's surety, if any, shall be liable for and shall pay the Owner the sums hereinafter stipulated as liquidated damages, and not as a penalty, for each calendar day of delay after the date established for Substantial Completion in the Contract Documents plus approved extensions of time, until all the Work is substantially complete: the sum of FIVE-HUNDRED DOLLARS ($500.00) per each day per each facility (ES, MS, or HS) not completed by the substantial completion date for that facility. Materials and workmanship shall be subject to observation and test by Owner and Architect, at any time during installation. Architect and Owner shall have the right to reject or require correction of defective materials and workmanship. THE SCHOOLDISTRICT RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS, IN WHOLE AND IN PART, AND TO WAIVE ANY TECHNICALITIES THEREIN.

Award

Educational

$400,000.00

Public - City

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
24
Bidding Soon
421
All Active Projects
156
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2022

July 28, 2022

img_map_placeholder

Multiple Locations, Dixon, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.