Renovation of a municipal facility in Theodore, Alabama. Completed plans call for the renovation of a municipal facility.

The work consists principally of providing bonds, labor, materials, equipment, and supervision necessary for the refurbishment of a dock fire protection system at the Alabama State Port Authority's Marine Liquid Bulk Terminal (MLBT) in Mobile, Alabama. All areas of the ASPA Marine Liquid Bulk Terminal are restricted access and require valid Port Access Credentials with special designation for entry into the facility. The MLBT dock is an integral component of the adjacent chemical manufacturing facility operated by INEOS Phenol. The facility discharges and loads the chemical components utilized in and generated from the manufacturing process at the MLBT dock. The dock vessel arrival schedule for the previous period of January 2022 thru June 2022 will be made available during the bidding process, by request. This schedule is provided for information only and may not be reflective of the actual vessel schedule during the project duration. The typical times at berth are 48 hours and 36 hours respectively for the K15503 and DLB106 vessels. The current vessel schedule for the project duration will be provided to the winning bidder on a daily basis, or more frequently as necessary, upon contract award and project mobilization. All bidders attending the MLBT site visit must contact the ASPA PM at least 24 hours in advance. All attendees not possessing valid ASPA credentials with the special designation to enter the MLBT terminal must be escorted into the facility by ASPA personnel. No same day escorts will be provided. All escorted individuals are required to have a valid state or federal identification. All vehicles entering ASPA properties are required to have proof of vehicle registration and insurance. All Contractors submitting bids are to carefully examine the site of the proposed work and thoroughly review the contract requirements prior to submission of a bid proposal. Each Bidder shall satisfy oneself as to the character, quality, and quantities of work to be performed, and as to the requirements of the proposed Contract. The submission of a proposal shall be proof that the bidding Contractor has made such examination and is satisfied as to the conditions to be encountered in performing the work and as to the requirements of the proposed Contract. Electing to not visit the site before bidding will not relieve the prospective bidders from the stated requirements to "satisfy oneself as to the character, quality, and quantities of work to be performed, and as to the requirements of the proposed contract". All bidding Contractors must hold a current license from the State Licensing Board for General Contractors, Montgomery, Alabama with a classification being (MU) Municipal & Utility or Specialty Construction, (M): Mechanical-Fire Protection Systems. A Guarantee will be required with each bid as follows: (5%) percent of the amount bid, but in no event more than Ten Thousand ($10,000) Dollars, shall be furnished in the form of a certified check or bid bond payable to the Alabama State Port Authority. Performance and Payment bonds will be required at the signing of the contract in an amount not less than One Hundred (100%) percent of the contract price. No bid will be considered unless the bidder, whether resident or non-resident of Alabama, is properly qualified to submit a proposal for this work in accordance with all applicable laws of the State of Alabama. This shall include evidence of holding a current license as required from the State Licensing Board for General Contractors, Montgomery, Alabama. Also, non-residents of the State must show evidence of having qualified with the Secretary of State to do business in Alabama. Insofar as practical, the order of work will be as scheduled by the Contractor and approved by the ASPA Project Manager and INEOS PIC. The Contractor is required to submit a schedule detailing the sequence of work and time frame for Contractor's activities within 10 calendar days of receipt of the Notice to Proceed. Contractor's attention is directed to the fact that the facility's cargo handling operation is the priority item. Due to the on-demand nature of the deliveries required by the facility, daily coordination with the INEOS PIC is required to ensure efficient efforts by the Contractor and no interference of the operations. The Contractor will be provided continuous vessel schedule updates during the life of the project to aid in scheduling the work efficiently. All work shall be according to these specifications and all reference documents. The right is reserved, as the interest of the Alabama State Port Authority may require, to reject any and all bids and to waive informalities in bids received. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Municipal

$2,780,641.00

Public - State/Provincial

Renovation

27

5

9

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
33
Bidding Soon
487
All Active Projects
229
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2022

August 10, 2022

img_map_placeholder

7811 Rangeline Rd, Theodore, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.