BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Oak Grove, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

**As of August 17, 2022, project is cancelled. Project is no longer needed.** Each roadway segment listed below shall be treated as an individual project for the purposes of bidding. (Certain segments may be eliminated from the work roster after the Town review of bids/costs.) Crack-fill & Chip Seal Specifications/Requirements: -Bidder must provide a separate quote for each project as per the numbered lists above. -Bidder must verify the actual distance as well as the width of each road segment/project. (Mileage noted above is approximate.) -Hot Oil Asphalt at 320 to 350 degrees shall be applied. Specify the emulsions to be used for each application. -Specify a non-routed ( blow-n-go) option for crack-fill. FA2 washed pea rock is required for chips. -Work must include traffic control and prior sweeping of the roadway. -Proof of insurance must be enclosed with bids (workmans comp. and liability). -Project Deadline: All roadwork must be completed by September 1, 2022. The Town of Oak Grove reserves the right to reject any or all bids, to waive irregularities or informalities in the bids received, and to accept any bid most favorable to the Town. Bidders must be deemed competent to responsibly complete the project.

Project Abandoned

Roads / Highways

$90,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
50
Bidding Soon
851
All Active Projects
363
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2022

August 18, 2022

img_map_placeholder

500th Ave, Oak Grove, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.