BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Willcox, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of October 2, 2024, this project has been completed. *The closed solicitation has been included below for reference: The project will include the design and construction of chip sealing and ADA Compliant Sidewalk on Scott Street from curb to curb from Arizona Avenue to the dead end. The project also consists of the construction of approximately 2,000 linear feet of sidewalks along Scott Street which will comply with ADA standards. The total square footage of pavement is approximately 8,000 sf. In addition, drainage crossings will be constructed with concrete product and compliant with MAG standards. Each drainage crossing is approximately 50 ft. x 5 ft. x 6". In accordance with the City of Willcox's procurement regulations and Federal Grant requirements, the City is soliciting professional engineers to provide design and construction management for Scott Street and Sidewalk Improvements. The City of Willcox has been awarded a Community Development Block Grant (CDBG) through the State of Arizona Department of Housing (ADOH) funded by the U.S. Department of Housing and Urban Development (HUD) for this work. The ENGINEER shall provide all of the materials and services required by this Contract in accordance with recognized professional standards, and in a competent and acceptable form and manner including: Provide all professional and basic services necessary to prepare all preliminary and final design plans, specifications, cost estimates and bid documents, including but not limited to: design, all surveying as needed, and documentation of existing conditions as needed. Firm is to assure and provide all components required to fully design and construct this project, including any alternative recommendations, cost estimates, and construction coordination as needed to complete the project. Firm is to be in compliance with all local, county, state, and federal codes and requirements. All construction must comply with current ADA regulations and guidelines. Any questions about this RFQ must be e-mailed on or before Tuesday, January 24th, 2023 BY 12:00 P.M. (ARIZONA TIME)to the following person:Crystal Hadfield, City ClerkCity of Willcoxchadfield@willcox.az.gov The method of Contractor Selection has not been Determined at this time.

Occupancy

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
10
Bidding Soon
118
All Active Projects
43
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.