BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, paving and new construction of a mixed-use development in Jerico Springs, Missouri. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Job No: JSR0059 Location : From Route 97 in Cedar Co. to MO 13 in Polk Co Proposed Improvement: Curve Realignments, Left-turn Lane Additions, Bridge Replacement Length: 25 Miles The method of contractor selection has not been determined at this time. MODOT - RFQ Engineering - Curve Realignments, Left-turn Lane Additions, Bridge Replacement

Conceptual

Bridges / Tunnels

$4,534,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
55
Bidding Soon
558
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2023

Project location map

State Hwy 97, Jerico Springs, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.