BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Springfield, Illinois. Contact the soliciting agency for additional information.

CMS, in agreement with CPO-GS, desires to establish establish a 4 year agency specific contract for uninterrupted power supply (UPS) inspection, repair and maintenance for J0146, 201 W. Adams, Springfield, Illinois. Pursuant to CPO Notice 2020.06, State agencies shall only accept electronic submissions for competitive solicitations. Paper responses will not be accepted. Full Preventative Maintenance with Battery Inspection at J0146 201 West Adams, Spfld, IL Performed Quarterly for FIRST YEAR Repair work Mon-Fri 8AM - 5PM. at J0146 201 West Adams, Spfld, IL (Minimum 4 hours) FIRST YEAR Repair work Mon-Fri 5PM - 8AM and Saturdays. at J0146 201 West Adams, Spfld, IL (Minimum 4 hours) FIRST YEAR Repair work Sundays and Holidays. at J0146 201 West Adams, Spfld, IL (Minimum 4 hours) FIRST YEAR Full Preventative Maintenance with Battery Inspection at J0146 201 West Adams, Spfld, IL Performed Quarterly for SECOND YEAR Repair work Mon-Fri 8AM - 5PM. at J0146 201 West Adams, Spfld, IL (Minimum 4 hours) SECOND YEAR Repair work Mon-Fri 5PM - 8AM and Saturdays. at J0146 201 West Adams, Spfld, IL (Minimum 4 hours) SECOND YEAR Repair work Sundays and Holidays. at J0146 201 West Adams, Spfld, IL (Minimum 4 hours) SECOND YEAR Full Preventative Maintenance with Battery Inspection at J0146 201 West Adams, Spfld, IL Performed Quarterly for THIRD YEAR Repair work Mon-Fri 8AM - 5PM. at J0146 201 West Adams, Spfld, IL (Minimum 4 hours) THIRD YEAR Repair work Mon-Fri 5PM - 8AM and Saturdays. at J0146 201 West Adams, Spfld, IL (Minimum 4 hours) THIRD YEAR Repair work Sundays and Holidays. at J0146 201 West Adams, Spfld, IL (Minimum 4 hours) THIRD YEAR Full Preventative Maintenance with Battery Inspection at J0146 201 West Adams, Spfld, IL Performed Quarterly for FOURTH YEAR Repair work Mon-Fri 8AM - 5PM. at J0146 201 West Adams, Spfld, IL (Minimum 4 hours) FOURTH YEAR Repair work Mon-Fri 5PM - 8AM and Saturdays. at J0146 201 West Adams, Spfld, IL (Minimum 4 hours) FOURTH YEAR Repair work Sundays and Holidays. at J0146 201 West Adams, Spfld, IL (Minimum 4 hours) FOURTH YEAR Materials at cost for repair to be used for unexpected repairs outside of the quarterly and annual PM and Battery maintenance inspections. Is this a Small Business Set Aside Procurement: No Is there a BEP/VBP Participation Goal : Yes If yes, BEP Goal Percentage: 1.00000 If yes, VBP Goal Percentage: 0.00000 Blanket/Contract Begin Date: 07/01/2022 Blanket/Contract End Date: 06/30/2026

Post-Bid

Municipal

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
64
Bidding Soon
980
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2022

July 1, 2022

Project location map

201 W Adams St, Springfield, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.