Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, renovation and addition to a mixed-use development in Calgary, Alberta. Completed plans call for the addition of a 35,144-square-foot, two-story above grade fitness / recreation center; 24,756-square-foot swimming pool; for the renovation of a 80,729-square-foot swimming pool; and for site work for a fitness / recreation center.
M3 Development Management Ltd ("M3") acting as Project Manager, on behalf of Lindsay Park Sports Society ("LPSS" or "Client"), invites Proponent's to submit a proposal to highlight their qualifications for the new Lindsay Park Sports Society Expansion and Enhancement Project. Expanded Competition Aquatic Facilities; -Renovation of approx. 7,500 sq m; -New 10 lane, 2m deep, 50m FINA compliant pool; -New 25m x 25m dive tank and dive tower; -New pool mechanical systems; -Redeveloped centre spine to accommodate administration relocation, top-loaded spectator seating, and competition pool support spaces below. South Addition Expanded Sport Space & Enhanced Main Entry; -New approx. 3,265 sq m south addition; -New change rooms; -New administration space; -Main entrance to be reoriented east for a more inviting experience; -Main entrance to provide a new central gathering & social space; -Improved control point and circulation; New Leisure Aquatic Facilities; -New approx. 1,850 - 2,300 sq m west addition with recreational pools and amenities. Additional Parking; -Existing surface parking lot expansion to accommodate an additional 130 stalls; -Increased Connection to the Park; -New glazing into the natatoriums; -New spray pad on the building's west side. In parallel with this project, the LPSS is in the planning stages of a renovation and expansion of the MNPCSC focusing on the modernization of training and competition amenities to re-establish the Centre as a centre of excellence for aquatics training and competition in Canada and ensuring compliance with current FINA standards. That project is known as the Legacy Project and is referenced in this charter as a parallel activity with potential synergies between the two projects. Leisure Expansion Aquatic Program (LEAP); -(+/-) 25,000 sq ft leisure water (amenities to be determined); -130 stall parking lot. Surface Parking lot redesigned to accommodate additional parking spaces. -New entrance, locker rooms, offices, circulation space, meeting rooms and food services. Legacy Enhancement and Expansion Program (LEEP) -(+/-) 95,000 sq ft Competition pool expansion, dive tower construction, dive tank expansion, bleacher seating, team change rooms; The total development budget, inclusive of both the LEAP and LEEP phases is $75M which includes all soft costs and contingencies. The target value of Phase 1 LEAP is $45M. The target value of Phase 2 LEEP is $30M. The targeted hard cost / construction budget for the project will be developed collaboratively by LPSS, M3, the Construction Manager, Engineer of Record and the Prime Consultant. The Proponents, as a part of the 2nd Stage RFP Submission, shall independently evaluate appropriate construction cost estimate targets provided by LPSS. TIMELINE: Sub trade tenders are being issued sequentially by the construction managers. Construction has commenced.
Under Construction
Fitness / Rec Centers
$87,500,000.00
Public - State/Provincial
Addition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 22, 2022
September 12, 2024
2225 Macleod Trail SE, Calgary, AB
Related To This Project
Calgary, AB
Bid Date: Dec 20 2022
Calgary, AB
Bid Date: Nov 30 2022
Calgary, AB
--
Calgary, AB
--
Calgary, AB
Bid Date: Dec 08 2022
Calgary, AB
Bid Date: Feb 16 2021
Calgary, AB
Bid Date: Jun 16 2021
Calgary, AB
Bid Date: Dec 07 2022
Calgary, AB
Bid Date: Feb 10 2023
Calgary, AB
Bid Date: Jun 29 2022
Calgary, AB
--
Calgary, AB
--
Calgary, AB
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.