BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, asbestos abatement and new construction of a municipal facility in St Petersburg, Florida. Completed plans call for the construction of a 50,000-square-foot, three-story above grade municipal facility; for site work for a municipal facility; for the demolition of a municipal facility; and for asbestos abatement for a municipal facility.

The scope of this project includes, but is not limited to, the following: demolition, site work, asbestos abatement and new construction of a three story above grade municipal facility. As of January 17, 2023, a construction manager has been selected for this project. A firm construction timeline for this project has not yet been released. Phase one of this project is scheduled to be complete by March 2023, with bidding for phase 2 starting in June 2023, and overall construction is scheduled to start October 2023. BP1A Site Preparation (temporary fencing, erosion control, selective clearing & grubbing for building demo and new building pad area, cutting & capping existing wet utilities & removal for building demo, temporary wet utilities for construction and temporary trailer facilities, dewatering and earthwork for existing building demolition, earthwork for new building pad preparation, survey & layout, enabling electrical for making building safe for demolition and temporary site electrical for new construction and temporary trailer facilities); BP2A Demolition (existing building asbestos abatement, existing building demolition, selective specialty demolition of existing generator, generator fuel tank, demolition of existing utility yard slab on grade, demolition of existing irrigation pump and controller equipment, and an allowance for contaminated soils). All bidders must be prequalified with Skanska for consideration. Contact Jeff Cortney (Jeff.Courtney@skanska.com) for Skanska prequalification. Awards shall be based on the best interest of the Project as determined by Skanska. PLEASE NOTE: Overall construction cost of this project is $50 million. The value of these bid packages is estimated only.

Award

Municipal

$40,000,000.00

Public - State/Provincial

Asbestos Abatement, Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
55
Bidding Soon
946
All Active Projects
348
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2022

October 9, 2023

img_map_placeholder

525 Mirror Lake Dr N, St Petersburg, FL


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.