Renovation of a water / sewer project in Washington Township, New Jersey. Completed plans call for the renovation of a water / sewer project.

FILE NO.: SCE-R12937.011 NJEIFP No.: 1438004-001 The work will include but is not limited to Tank Repairs and Improvements for three (3) base bid water storage tanks and two (2) supplemental water storage tanks and Tank Surface Preparation and Recoating for three (3) base bid water storage tanks and two (2) supplemental water storage tanks. The contractor is responsible for providing all labor, supervision, trade skills, materials, and equipment required for this project as described in the Construction Documents. All bidders are required to comply with all requirements set forth in the Bid Documents. Bid Documents shall include all documents included in the bid package including those documents defined in the Contract as the Contract Documents. Bids not meeting these requirements may be considered nonresponsive. All applicable surety bonds required in connection with the advertisement and award of building contracts or sub agreements must be written by a surety company listed on the Federal Treasury List (Department Circular 570 Surety Companies Acceptable on Federal bonds), incorporated herein by reference. Copies of this document may be obtained from the Department. The Washington Township Municipal Utilities Authority reserves the right to accept or reject any and all bids or to waive informalities therein which, in its judgment, serves the best interest of the Washington Township Municipal Utilities Authority. No bidder may withdraw their bid during the period beginning upon bid opening date and ending sixty (60) calendar days. Nothing herein prevents a bidder from requesting of the Authority from allowing a bid withdrawal pursuant to N.J.S.A. 40A:11-23.3. This project is subject to both Davis Bacon wage rate requirements and New Jersey Prevailing wage rate requirements. The contractor shall utilize the higher of the two rates in each and every category of work on the project. This project is expected to be funded in part by New Jersey Department of Environmental Protection (NJDEP) and New Jersey Environmental Infrastructure Trust (NJEIT). Neither the State of New Jersey, the NJEIT nor any of their departments, agencies or employees is, or will be, a party to this contract or subcontract. This contract or subcontract is subject to the provisions of N.J.A.C. 7:22-3,-4,-5,-9 and -10. Attention is called to the fact that the contractor must ensure that employees and applicants for employment are not discriminated against because of their race, creed, color, sex or national origin and to the greatest extent possible, opportunities for training and employment shall be given to lower-income residents of the project area and that, when possible, contracts shall be awarded to business concerns owned by area residents. Small, Minority and Women's Business Enterprises are encouraged to submit bids. Bids for proposals in excess of $100,000 must be accompanied by a written Affirmative Action Plan. Bidders are required to comply with the requirements of P.L. 1975, c. 127. In accordance with the provisions of N.J.S.A. 58:11B-26, N.J.A.C. 7:22-3.17(a)24 and 4.17(a)24, the Contractor (subcontractor) shall comply with all the provisions of N.J.A.C. 7:22-9.1 et seq. for the participation of small business enterprises owned and controlled by socially and economically disadvantaged individuals (SEDs). All contractors, including SED contractors, shall submit their own SED Utilization Plan to the NJDEP OEOPCA, with a copy to the Owner, within thirty (30) days of the contract award. The contractor's plan shall contain provisions to meet the specific SED Utilization requirements of the contract. The contractor's plan shall outline the entire project or contract work, the estimated time to complete the work, each significant segment of work on which SEDs will or may participate and a description of how SEDs will be contacted. The Contractor shall submit SED Participation Monthly Progress Reports (Form OEO-003) to the Project Compliance Officer and shall submit SED Participation Building Phase Quarterly Reports (Form OEO-002) to the Project Compliance Officer and to the OEOPCA, in accordance with N.J.A.C. 7:22-9.12. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31et seq. and N.J.A.C. 17:27-1 et seq.

Award

Water / Sewer

$1,041,500.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
473
Active Projects
221
Bidding Soon
4,308
All Active Projects
2,006
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2022

July 25, 2022

img_map_placeholder

Multiple Locations, Washington Township, NJ

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.