BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Manitou Springs, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Manitou Springs is accepting bids for the mill and paving of Uinta Road and a portion of Via Chula Vista There will not be a public bid opening A 5% bid bond is required for the project The Selected Contractor will be required to obtain performance and payment bonds to cover 100% of the project contract amount. Notice of Award is expected by July 11th and work should be expected to start on or after the week of August 17th - pending approval of Manitou Springs City Council and Pikes Peak Rural Transportation Authority (PPRTA). PPRTA will be utilized to fund this project. PPRTA Special Provisions will be part of the awarded contract. Question Acceptance Deadline 06/29/2022 06:00 PM EDT Questions are submitted online No Award Requirements - Reserve Rights to Award by Line Item The bid shall have an Anticipated Scope of Services that includes the following: The Contractor will provide project costs for crews and equipment, anticipated mobilization time, and anticipated project completion time. The Contractor is responsible to provide all materials and equipment necessary for fabrication, construction, and/or installation of this project. The Contractor is responsible for clean-up of area and affected near-by areas of the project and removal of all wastes on a daily basis. The Contractor is responsible for damages, inside or outside the project area. The Contractor is responsible for their own confined space, roadway, and trenching safety procedures. If the project requires street closure - partial or otherwise, the Contractor shall provide all necessary traffic control. All traffic control personnel must at a minimum carry a current CDOT Flagger Certification. A Traffic Control Plan must be submitted to and approved by City staff at the pre-construction meeting. The pre-construction is to be scheduled at time of accepting the contract. Notice of Award is expected by July 11 th and work should be expected to start on or after the week of August 17 th

Award

Roads / Highways

$88,298.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
50
Bidding Soon
680
All Active Projects
300
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2022

August 17, 2022

img_map_placeholder

Multiple Locations, Manitou Springs, CO

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.