BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Fitchburg, Massachusetts. Completed plans call for the renovation of a municipal facility.

Filtered Water Bottle Filling Station DBE PARTICIPATION: MART is under a time of race conscious DBE participation. This means that every competitive procurement we do must have a Contract Goal of 2% DBE Participation. Respondents will be scored (up to 5 points) on the efforts to obtain DBE subcontractors. A promise to use DBEs after contract award is not considered to be responsive to this RFR nor does it constitute good faith efforts Time to completion: Contractor is allotted 30 calendar days from contract award to complete all work outlined, to the satisfaction of the Montachusett Regional Transit Authority ("MART"). SUMMARY OF WORK 1. The Primary scope of work can be summarized as: a. Removal of existing fountains, bubblers, and/or water stations in locations where they already exist. b. Installation of new standard filtered water station at designated locations. i. Wall mounted, filtered, and chilled such as: Elkay ezH2O Liv or equivalent/ similar product c. Required to leave location in a finished state (selective demo, patch & paint, cleanup as required).

Post-Bid

Municipal

$56,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
245
Bidding Soon
3,093
All Active Projects
1,369
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2022

September 30, 2022

img_map_placeholder

1427R Water St, Fitchburg, MA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.