BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a civil project in Dunn, Wisconsin. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

Site Directions: Grass Lake is located in Section 30, Town of Dunn (T.6N,R.10E), Dane County, WI. (42.959170N 089.349252W) Project Category Code: Erosion Control/Slope, Bank Stabilization, Watershed Protection/Riprap, Water Resources (River/Stream), Sitework/Excavating and Grading Description: Work of this Contract comprises restoration of an eroding earthen dike which separates Grass Lake from Grass Lake Tributary to Oregon Branch Badfish Creek, for the Madison Metropolitan Sewerage District (OWNER). Work includes, but is not limited to improvements to approximately 650 feet of access driveway prior to construction, abandonment of seven monitoring wells, rebuilding approximately 4600 linear feet of the dike (to 1958 design with 12 feet top width and 2:1 side slopes), constructing approximately 1630 linear feet of stone toe, approximately 1000 linear feet of floodplain benches, and 3 cross vanes and 8 J-hooks as in-stream flow deflection structures, replacement of a culvert, and seeding and blanketing of the restored dike. Additonal Description: All prospective bidders must be qualified for this specific Work. Before proposals will be accepted for the work contemplated herein, the Owner will conduct such investigation as is necessary to determine the performance record and ability of the prospective bidders / subcontractors to perform the size and type of work specified in the Contract Documents. All prospective bidders must submit qualifications for review and approval by the District. Subcontractors are not required to submit qualifications. Prequalification applications will be distributed with the Contract Documents or can be obtained from the District. Bidders who have already submitted prequalification documentation to the District within the current calendar year need not resubmit but must notify the District in writing by the prequalification due date (using the form provided) of their intent to prequalify for this specific work. Prequalification applications must be completed and submitted to the District office no later than 5:00 p.m. Tuesday, June 28, 2022. Bidders will be notified only of disqualification no later than Friday, July 1, 2022. Bids received from bidders without prequalification documents on file with the District will not be opened. Bids will not be accepted from contractors that have been debarred or suspended by the Federal government (listed on the federal "Excluded Parties List").

Bid Results

Bridges / Tunnels

$489,616.00

Public - City

Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
431
Active Projects
168
Bidding Soon
2,628
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2022

August 15, 2022

Project location map

To Be Determined, Dunn, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.