BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2024 at 7:00 PM

Updated March 6, 2024

Renovation of a power facility in Mesa, Arizona. Design plans call for the renovation of a power facility.

Services to be performed may include Full design services including but not limited to architectural, structural, mechanical, electrical, plumbing, civil disciplines. Services will include programming through construction administration for the renovation of the existing MCSO substation location on the Maricopa County Southeast Campus. Contract duration: One Time Purchase Contract renewal: Not Applicable Prices good for: Not Applicable No pre-bid or site visit will be held. Q & A deadline: Jul 12, 2022 5:00:00 PM EDT The method of Contractor Selection has not been Determined at this time.

Design

Power Plant

$1,000,000.00

Public - County

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
40
Bidding Soon
1,174
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2024

Project location map

Multiple Locations, Mesa, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.