EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 5, 2022 at 8:00 PM

Updated January 4, 2025

Renovation of a mixed-use development in Fairfax, Virginia. Completed plans call for the renovation of a communication facility; and educational facility.

Project no- 11187629-001, . 247-18339-003 This project is generally described as renovations include replacement of telecommunications outlets & cabling that is not CAT6A rated, expansion of some Telecommunications Rooms (TRs), and the installation of interior Wireless Access Points (WAPs). Bidders Questions must be submitted through Mason's Construction Management Software Project, eBuilder on or before 08 July 2022. Owner reserves the right to respond to any questions received after the date as indicated in the Invitation for Bid. The Owner reserves the right to reject any or all bids. All bid submissions greater than $100,000.00 will require the following bonds a) HECO-10 - Standard Performance Bond b) HECO-10.1 - Standard Labor and Material Payment Bond All bid submissions greater than $500,000.00 will require the following bonds a) HECO-10 - Standard Performance Bond b) HECO-10.1 - Standard Labor and Material Payment Bond c) HECO-10.2 - Standard Bid Bond Project Award Date: 03 August 2022 Substantial Completion Date: 17 March 2023 Final Completion Date: Thirty (30) Calendar Days after Substantial Completion Furnish all labor, new materials, tools, equipment, supplies and services for all work as indicated, in accordance with provisions of the Contract Documents. B. Although such work is not specifically indicated, furnish and install all supplementary, miscellaneous, incidental items, tests and inspections, appurtenances and devices incidental to, or necessary for, a sound, secure and complete installation. C. The Work shall be complete, and all work, materials, and services not expressly called for in the Specifications which may be necessary for complete and proper construction to carry out the Contract in good faith, shall be performed, furnished, and installed by the Contractor at no additional cost to the Owner. Qualified, careful and experienced workers shall execute the Work in the best and most workmanlike manner.

Award

Communication

$1,893,433.00

Public - State/Provincial

Renovation

260

36

15

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Screening Devices

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
69
Bidding Soon
1,968
All Active Projects
770
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2022

August 25, 2022

img_map_placeholder

4400 University Dr, Fairfax, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.