Demolition, site work, paving, renovation and addition to a mixed-use development in Mifflinburg, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the addition of a water / sewer project; for the demolition of a water / sewer project; water / sewer project; and for the renovation of a water / sewer project.

As of May 17, 2023, the project is pending award. A timeline for award has not been confirmed. Contract Number: 21-016, 23-1, 23-2, 23-3 General Construction: General Contractor shall perform general construction of the Upgrade and Expansion of Lewis Township's existing Wastewater Treatment Plant (WWTP) as fully described in the Conformed Project Manual. Provide new treatment facilities as needed to produce a fully functioning plant including but not limited to: mechanical and manually-cleaned influent screens in new channel, duplex submersible influent pump station, aeration blowers, return/waste sludge plus nitrate and mixed liquor recycle pumps in the existing Treatment Building, chemical feeds in a portable building. Convert sequencing batch reactors into aerobic digesters. Provide all with associated process piping, fittings and valves inside buildings and tanks as well as buried. Provide a motorized trolley hoist system (capacity 1 ton). Provide on all existing buildings: new metal roof and associated insulation, soffit, fascia, gutters and downspouts, trim and other accessories; new doors and hardware; upgrade existing stairs and replace existing walkway. Demolish existing roofing on all buildings, doors, SBR walkway and equipment, pumps and blowers in the treatment building, effluent pumps, chlorination and other treatment tanks, existing electrical power distribution and controls, heating and ventilation. Provide new lab workbench and plumbing in control building. Township has prepurchased precast posttensioned biological reactor, secondary clarifier, ultraviolet (UV) light disinfection system and reaeration basin from manufacturer who will provide (furnish and install) the tanks themselves, and furnish submersible mixing pumps, air diffusers, pipe, valves, handrail and accessories to be set inside or on top of the tanks. General Contractor shall provide all excavation, backfill and compaction necessary for manufacturer to install the tanks and furnish the labor to install the equipment inside the tanks. General Contractor shall provide all associated accessories and facilities to provide a fully functioning treatment plant including outfall sewer; painting, erosion and sediment control, site restoration, take down and restore as needed existing fencing. Remove and safely dispose of existing wetlands contents. Electrical Construction: Electrical Contractor shall perform electrical construction of the Upgrade and Expansion of Lewis Township's existing Wastewater Treatment Plant (WWTP) as fully described in the Conformed Project Manual. The project includes but is not limited to providing electrical power supply and control wiring to the following new treatment facilities: mechanical influent screen, influent pump station, aeration blowers, return/waste and internal recycle pumps, chemical feeds in a portable building, UV disinfection and submersible mixing pumps in new treatment tanks. Integrate control panels provided with screen and influent pumps with process control panel provided by Dutchland. Provide variable frequency drives for aeration blowers, influent and recycle pumps. Provide process control metering and instrumentation. Provide all-new LED site and building interior lighting. Provide power to a trolley crane, electric heaters, and ventilation fans in various arrangements for one new and all existing buildings. Deenergize existing electrical power distribution and controls, pumps, blowers heating and ventilation in the treatment building, as well as effluent pumps, to allow General Contractor to demolish. Provide all other electrical accessories and facilities necessary to provide a fully functioning treatment plant including wiring, conduit and hangars, safety switches, receptacles, etc. Heating and Ventilation Construction: Heating and Ventilation Contractor shall perform heating and ventilation construction of the Upgrade and Expansion of Lewis Township's existing Wastewater Treatment Plant (WWTP) as fully described in the Conformed Project Manual. Provide electric heaters and ventilation fans in various arrangements for one new and all existing buildings, including all necessary accessories and facilities to provide fully functioning buildings. Bidders must provide with their Proposal (or Bid) either a certified bank treasurer's check, a certified cashier's check payable to the order of Lewis Township Supervisors or a bid bond in the amount of ten percent (10%) of the bid. Bidders must also provide with their Proposal a fully completed Non-Collusion Affidavit and a Public Works Employment Verification Form. The two apparent low bidders for each contract will be required after bids are opened to provide proof of prior experience and adequate resources to complete the project. The successful low bidder for each contract will be required to furnish fully executed original Proposal (or Bid) forms. Failure to fully comply with all bid requirements including but not limited to the above will be cause to reject a bid. Bidders are advised that PA Prevailing Minimum Wage Rates are incorporated in the Contract Documents and must be paid to all workers employed at the construction site. Lewis Township may hold all Bids and they shall remain irrevocable for 120 days from the Bid Opening date, which includes 60 days that may be needed to secure funding. The Township reserves the right to accept or reject any or all bids, waive any informalities or irregularities, or negotiate contract amounts. The successful Contractors will be required to furnish upon Contract Award a Performance Bond and a Payment Bond, each for one hundred (100%) percent of the contract price as bid. CLARIFICATION DEADLINE 1/18/2023 4:00 PM

Bid Results

Water / Sewer

$77,277.00

Public - City

Addition, Demolition, Paving, Renovation, Site Work

66

36

24

4

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
32
Bidding Soon
637
All Active Projects
271
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2023

February 22, 2023

img_map_placeholder

To Be Determined, Mifflinburg, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.