BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lakewood, Ohio. Completed plans call for site work for a water / sewer project.

The major work to be accomplished under this contract will be the following: 1. Placement of Engineered Fill that will fill the existing depressed area of the site to provide drainage to the northwest corner of the site. 2. Installation of a new storm sewer line to the west along the southern property line and north along Belle connecting to existing manhole in the roadway. 3. Locating and removing the existing buried sewer approximately 42" in height. The buried sewer was once an open channel with brick/concrete walls with a shale bottom that a concrete arch was placed atop the walls and backfilled. 4. This work includes removal and returning to the city the drainage pumps and a transformer. 5. The work includes all utility coordination with First Energy to de-energize lines. 6. The work includes site restoration including fencing, pavement, curb, topsoil and seeding, and other appurtenances. 7. The work includes maintenance of traffic and erosion and sediment control. The Contractor is advised that the site contains PCE (Tetra chore thane) contaminants within the groundwater below the existing mud matt. The Contractor shall perform their work in a manner as to not discharge groundwater to the storm sewer system. If the Contractor's means and methods encounters high concentrations of contaminants then the Contractor shall mitigate the matter at their own expense and within EPA regulations. The Contractor shall fill a majority of the site draining to the northwest corner of the site. The contractor shall install a temporary sump with power draining the surface water to the existing sanitary manhole located on Belle. Upon successful testing of the collected water by the City (i.e., no PCE contaminants) for 2 consecutive successful tests, the Contractor may then remove the berm and complete the final grading, topsoil and seeding, as directed by the Engineer.

Award

Water / Sewer

$906,296.00

Public - City

Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
53
Bidding Soon
1,208
All Active Projects
440
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2022

September 6, 2022

img_map_placeholder

14519 Detroit Ave, Lakewood, OH

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.