BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a water / sewer project in Big Chimney, West Virginia. Completed plans call for the renovation of a water / sewer project.

The work under this special provision shall consist of furnishing all materials, equipment and labor necessary to construct the pump system in conformance with the details on the Project Plans, in accordance with these special provisions, the plans and details and as directed by the owner. This specification describes a variable frequency drive controlled centrifugal pump station. Design, manufacture, and testing are the sole responsibility of the selected pump station manufacturer. The pump station is to provide water to the irrigation system while simultaneously maintaining a constant discharge pressure by using a prefabricated pump station with variable frequency drives for pressure regulation, under varying flow conditions up to the maximum specified capacity and will be UL QCZJ - "Packaged Pumping System." Pump system equipment, start-up, training, close-out packages, clean-up and guarantees are a part of this item. The Pump System shall be constructed in accordance with the details shown on the project plans, except as specified herein. The prefabricated pump station is to have, at the station discharge isolation valve, the volumetric flow rate and pressure stated in the technical specifications. Centrifugal pumps shall be constructed on a manifold to enable a variable frequency drive to sequentially start the pumps in order to maintain the necessary flow volume at design pressure. The main pumps are to operate at no more than 3,600 RPM. The station shall be completely wired, piped, hydraulically, electrically, and flow tested to full station capacity at factory prior to shipment to job site. Construction shall include a fabricated steel plate and skid assembly to support all components during shipping and to serve as the installation mounting base. The pump station shall include multiple VFD's one (1) per motor for proper operation. Job Completed by September 15, 2022 Questions Regarding Specifications: Jeff Hutchinson, Executive Director Recreation Commission 375 Henry C Hoppy Shores Drive Charleston, IAA/ 25302 Telephone (304) 533-6570 Questions Regarding Bid Submission: Jerie Whitehead Kanawha County Commission 407 Virginia Street, East Charleston, WV 25301 Email: jeriewhitehead@kanawha.us

Bid Results

Water / Sewer

$150,009.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
72
Bidding Soon
647
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2022

August 24, 2022

Project location map

375 Henry C Hoppy Shores Dr, Big Chimney, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.