BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Huntsville, Alabama. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of August 09,2022, this project has not yet been awarded. A timeline for award has not yet been established.** For Phase II - Road Improvements and Parking Lot Repairs at Alabama A and M University A cashiers check or bid bond payable to Alabama A&M University, in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and statutory Labor and Material Payment Bonds, and insurance in compliance with requirements, will be required at the signing of the Contract. Other sets for general contractors, and sets for subs and dealers, may be obtained at the same amount. Partial sets will not be available. Bids must be submitted on proposal forms furnished by the Architect or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as amended, and must show such evidence of license before bidding or bid will not be received or considered by Architect or Owner; The bidder shall show such evidence by clearly displaying their current license number on the outside of the sealed envelope in which the proposal is delivered; Bidder must also include their current license number on the Proposal Form. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of NINETY (90) days. This project is being bid without sales taxes according to Act 2013-205 (of the Alabama Legislature). However, sales tax for the base bid and all other bid items must be accounted for on the contractors Bid Proposal Form. ABC Form C-3A indicates how the sales tax shall be accounted for on the bid proposal form and shall be modified by the project architect as appropriate for bid items on each project. Completion Time: Work shall commence on the earlier of either the date of the owners written Notice to Proceed or the contractors receipt of the fully executed contract and shall be Substantially Complete within 270 Consecutive Calendar Days thereafter. Supervision: Contractor to provide Superintendent(s) to ensure proper supervision for all work.

Award

Roads / Highways

$2,942,878.00

Public - State/Provincial

Paving, Site Work

50

17

19

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
19
Bidding Soon
388
All Active Projects
147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2022

August 8, 2022

img_map_placeholder

4900 Meridian St N, Huntsville, AL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.