BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 17, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Burlingame, California. Completed plans call for site work for a water / sewer project.

The El Camino Real sewer main improvement work shall consist of replacing and installing new sewer mains in the City of Burlingame. Approximately 670 linear feet of new 12-inch, 925 linear feet of new 10- inch, and 2,063 linear feet of new 8-inch High-Density Polyethylene (HDPE) sewer main will be installed along El Camino Real with tie-ins at the intersections ofTrousdale Dr., Ray Dr., Albemarle Way, Westmoor Rd., Sherman Ave., Broadway, Sanchez Ave., Edgehill Dr., Forest View Ave., Palm Dr., Arc Way, and Willow Ave. The construction method is anticipated to be pipe-bursting with portions of conventional open trench and spot repair. One existing manhole will be abandoned, one new manhole will be installed, and one existing manhole will be brought to grade. Approximately 25 existing sewer laterals will be removed, replaced, and reconnected to the new main. Miscellaneous concrete work will be performed as needed and will consist of approximately 400 square feet of concrete sidewalk. Minor asphalt work for pavement restoration, traffic control, and temporary bypass pumping will also be required. The Adeline Drive water main improvements work shall consist of replacing and installing a new water main in the City ofBurlingame. Approximately 390 linear feet of new 6-inch Ductile Iron Pipe (DIP) water main will be installed along El Camino Real with tie-ins at the intersection of Adeline Dr. The water main will typically be installed at three-and-a-halffeet minimum cover in the Caltrans right ofway and three feet minimum cover within Burlingame right of way. One fire hydrant assembly will be installed. The new water main consists of twelve 6-inch fittings and thrust blocks, two 6-inch gate valves, and removing one existing blow off valve. Miscellaneous concrete work will be performed as needed and will consist of approximately 40 square feet of concrete sidewalk and 10 linear feet of concrete curb and gutter. Minor asphalt work for pavement restoration, traffic control, and temporary bypass pumping will also be required. The work along El Camino Real is within the Caltrans right-of-way. Therefore, the project does require coordinating with Caltrans for traffic control, obtaining all the necessary permits for construction, and adhering to all the Caltrans right-of-way requirements, including, but not limited to, the 2018 Caltrans Standard Plans and Specifications and these special provisions. The City is applying for a Caltrans encroachment permit. The contractor will be required to apply for a rider permit and adhere to all the requirements of said rider permit. Special Provisions, Specifications and Plans, including prevailing wage rates to be paid in compliance with Section 1773.2 of the California Labor Code and related provisions, may be inspected in the office of the City Engineer during normal working hours at City Hall, 501 Primrose Road, Burlingame, California, and are also available for review at the State of California Department of Industrial Relations' Web site. The Contractor shall possess a Class A license prior to submitting a bid. No contractors and subcontractor may be listed on the bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.5(a)]. All contractors and subcontractors will be required to furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement). All work specified in this project, shall include the base bid and alternate bids (if shown in Proposal), and shall be completed within 110 of Working Days (WD) (one hundred ten working days) from date of the Notice to Proceed.

Award

Water / Sewer

$2,122,595.00

Public - City

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
406
Active Projects
177
Bidding Soon
3,106
All Active Projects
1,324
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.