Site work and paving for a road / highway in Freeland, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Job Location: On M-47 (White Beech Dr. to Garfield Rd.) 0.69 miles, Saginaw Township, Saginaw County. POB - 400 feet South of White Beech Drive POE - 160 feet North of Garfield Drive (north spring point of intersection) Job Location: On M-47 (Church to south of Powley Drive) 0.51 miles, Tittabawassee Township, Saginaw County. POB - 19 feet South of Church Street POE - 950 feet South of Powley Project Schedule: Work may begin immediately after receiving approval from MDOT. Work to be completed between July 11, 2022, to July 22, 2022. Once work starts, must be completed in 5 consecutive days. Notice must be provided to Dan Senske at 989-233- 1053 a minimum of three (3) calendar days prior to beginning work. Description of work: The work shall be 1.5" HMA Overlay on 60' wide concrete pavement. In addition, HMA overlay shall be placed on the 8' wide shoulders. HMA overlay on shoulders, shall be tapered from 1.5" thickness at road lane edge to 3/4" thickness at shoulder edge. (HMA, 5E3: PG 64-28, AWI: 260) Construction Butt Joints shall be placed at the following locations: 1) Point of Beginning 2) Point of Ending 3) East side of M-47 at Tittabawassee Road intersection 4) West side of M-47 at Tittabawassee Road intersection 5) M-47 and Garfield Intersection Description of work: Church Street to Powley Street, the work shall consist of 1.5" HMA Overlay on 62' wide concrete pavement. (HMA, 5E3: PG 64-28, AWI: 260) Powley Street to 950 feet south, the work shall be 1.5" HMA Overlay on 60' wide concrete pavement. In addition, HMA overlay shall be placed on the 8' wide shoulders. HMA overlay on shoulders, shall be tapered from 1.5" thickness at road lane edge to 3/4" thickness at shoulder edge. (HMA, 5E3: PG 64-28, AWI: 260) Construction Butt Joints shall be placed at the following locations: 1) Point of Beginning 2) Point of Ending Maintaining Traffic: Traffic control devices and equipment will be supplied and laid out by the contractor and should be maintained per typical m0250a, m0380a and m0440a. Work on Saturdays and Sundays will be at the Engineers discretion and require preapproval. Traffic may not drive on milled surfaces. Crossroads and driveways will remain open to traffic at all times. Any flag operations/lane closures shall have a 1-mile maximum limit, or as directed by Engineer. This project is a Maintenance funded project, which means that there will be absolutely no overpayment or extras. All material, labor and mobilization shall be included in the bid. MDOT will have the low bid reviewed and approved for funding. MDOT reserves the right to reject any bid that appears to be unqualified. Before award, MDOT may request a site plan review meeting with the low bid contractor. The improvements will be done in accordance with the Michigan

Award

Roads / Highways

$227,291.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
51
Bidding Soon
883
All Active Projects
359
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2022

July 11, 2022

img_map_placeholder

M-47, Freeland, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.