BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated August 23, 2025

Site work and renovation of a detention facility in Regina, Saskatchewan. Conceptual plans call for the renovation of a detention facility.

Work consists of a secondary water main to the facility and replacement of fire hydrants and isolation valves; and replacement of 30m of Asbestos main line that currently serves the facility. The project is to be completed in two phases with the installation of a new water main line into the facility. The second phase is to include for replacement of fire hydrants and isolation valves within the facility. TIMELINE: Project details and timelines may be updated in the future, pending owner's decision to proceed. Coverage of this report is discontinued.

Project Abandoned

Jails / Prisons

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
17
Bidding Soon
193
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2025

Project location map

4040 9th Ave N, Regina, SK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.