BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a mixed-use development in Las Vegas, Nevada. Completed plans call for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; library; library; library; parking garage; parking garage; parking garage; water / sewer project; water / sewer project; and water / sewer project.

Services for: Las Vegas Academy of the Arts Phase I Phased Replacement 315 South 7th Street Las Vegas, Nevada 89101 Clark County School District MPID #0015904 Construction for Phase 1 at the Las Vegas Academy, which includes: utilities installations/demolition; new central plant; new parking structure; new gymnasium; perimeter fencing, temporary portable campus, relocation of all classes, cafeteria, administration and library from Main, Frazier Hall, Post Hall, Knapp Hall, Student Activity building, Locker Room building, and A and B Portables to temporary campus; Relocate Locker Room building to Gymnasium. The budget for construction cost for each project is $34,166,054.00 All general contractors must be pre-qualified with the Clark County School District and possess a Certificate of Eligibility from the Nevada State Contractors Board prior to submitting the Request for Qualification. The CMAR will provide the required pre-construction and construction services. Preconstruction services shall include assisting the design team with constructability matters, construction cost, value engineering, fast track options and scheduling. The construction services shall include determining a Guaranteed Maximum Price (GMP), procurement of all subcontractor contracts, and managing construction of the project. Selection Criteria and weighted values: General pass/fail, Applicant organization, workload and past performance (20%), Designated Project Manager and Superintendent experience on CMAR and Design Build with similar size and scope (20%), Project Management Plan (30%), Subcontractors and Safety Program (25%), Certificate of Eligibility for preference (5%). The estimated CMAR Phases will be Preconstruction Phase Services, September 19, 2022 July 28, 2023 and Construction Services, January 8, 2024 January 25, 2026. The Clark County School District invites all businesses, which includes women-owned, minority-owned, and disadvantaged business enterprise companies to participate. The Clark County School District is an equal opportunity employer and will not knowingly discriminate in any area of employment.

Post-Bid

Educational

$34,166,054.00

Public - County

New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
46
Bidding Soon
570
All Active Projects
251
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 6, 2022

January 8, 2024

January 25, 2026

img_map_placeholder

315 S 7th St, Las Vegas, NV


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.