BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 14, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Pittsburgh, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

No Longer Active No Construction Estimates are available Single Prime Contract Bids shall include a Bid Security Bond or Certified Check, payable to Shaler Area School District, in an amount of five percent (5%) of the bid, in accordance with Instructions to Bidders, as included in the Contract Documents. locations: Concrete Walk Replacement at Shaler Area Middle School 1810 Mt. Royal Boulevard Glenshaw, PA 15116 And Storm Line Replacement at Reserve Primary School 2107 Lonsdale Street Pittsburgh, PA 15212

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - County

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
114
Bidding Soon
1,768
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

July 29, 2022

Project location map

Multiple Locations, Pittsburgh, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.