BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a road / highway in Lake Mary, Florida. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and for outdoor lighting for a road / highway.

As of October 17, 2022, a shortlist of prospective firms has been released. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2025. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Selection Method : Letter of Response and Oral Presentation Financial Management Numbers : 44897413201 44897413202 44897613202 SR 15 (US 98) FROM NW 3RD ST TO NE 120TH ST TRC Members (Subject to Change) : Jennifer Freeman Kara Davis Stacy Hill The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-Utilized Work Groups are identified in the advertisement. Consultants are strongly encouraged to propose a DBE or Small Business to perform services for each Under-Utilized Work Group identified in the advertisement. Sr 15 (Us 98) From Nw 3rd St to Ne 120th St; Sr 15 (Us 98) From Sw 23rd St to Sw 3rd St Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site Financial Management Number(s) 448974 1 32 01; 448974 1 32 02; 448976 1 32 02 Longlist Date/Time 7/12/2022 Shortlist Selection Date/Time 7/19/2022 Phase II Submittal Deadline Date/Time 8/03/2022 Technical Review Committee Meeting 1 Date/Time 8/04/2022 Oral Presentation Date/Time 8/04/2022 Final Selection Date/Time 8/16/2022 Negotiations Period Begin Date 8/24/2022 Negotiations Period Ending Date 10/01/2022 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 15 (US 98) From NW 3rd St to NE 120th St

Conceptual

Roads / Highways

$14,080,931.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
71
Bidding Soon
1,271
All Active Projects
548
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.